Investment
Features
FeesSafety
Academy
More
Pluang+

Compare Sinergi Multi Lestarindo Tbk. (SMLE) vs Terregra Asia Energy Tbk. (TGRA) Price & Performance

Sinergi Multi Lestarindo Tbk.Trade
Terregra Asia Energy Tbk.Trade

Price performance (Past 24H)

Key statistics

Sinergi Multi Lestarindo Tbk. vs Terregra Asia Energy Tbk. — how do they compare? Sinergi Multi Lestarindo Tbk. trades at Rp185 (market cap 444.68B, 19.41M 24h volume), while Terregra Asia Energy Tbk. trades at Rp27 (market cap 74.25B). The key difference: Sinergi Multi Lestarindo Tbk. is far larger — about 6× Terregra Asia Energy Tbk.'s market cap. Which is the better fit depends on your goals.

SMLETGRA
Market Cap
444.68B74.25B
Volume
19.41M
Lot
194.13K
Turnover
3.66B
Average Price
188.72
Value
3.66B
Indicative Equilibrium Price
185
Indicative Equilibrium Volume
388

Returns comparison

Trailing returns across standard periods

Top news

Latest headlines on both assets

SMLE
View details
TGRA
View details

About Sinergi Multi Lestarindo Tbk.

PT Sinergi Multi Lestarindo Tbk (the Company) was established based on Deed No. 5 dated March 18, 2013 by Aryadi, S.H., M.Kn., Notary in Tangerang. PT Sinergi Asia Corporindo is the parent entity of the Company and Siu Min is the ultimate beneficiary owner of the Company.

Read more on SMLE

About Terregra Asia Energy Tbk.

PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.

Read more on TGRA