Investment
Features
FeesSafety
Academy
More
Pluang+

Compare Griptha Putra Persada Tbk. (GRPH) vs Krakatau Steel (Persero) Tbk. (KRAS) Price & Performance

Griptha Putra Persada Tbk.Trade
Krakatau Steel (Persero) Tbk.Trade

Price performance (Past 24H)

Key statistics

Griptha Putra Persada Tbk. vs Krakatau Steel (Persero) Tbk. — how do they compare? Griptha Putra Persada Tbk. trades at Rp59 (market cap 60B, 661.3K 24h volume), while Krakatau Steel (Persero) Tbk. trades at Rp224 (market cap 4.41T, 10.07M 24h volume). The key difference: Krakatau Steel (Persero) Tbk. is far larger — about 73.5× Griptha Putra Persada Tbk.'s market cap, and Krakatau Steel (Persero) Tbk. is more actively traded (10.07M versus 661.3K). Which is the better fit depends on your goals.

GRPHKRAS
Market Cap
60B4.41T
Volume
661.3K10.07M
Lot
6.61K100.67K
Turnover
39.67M2.28B
Average Price
59.99226.43
Value
39.67M2.28B
Indicative Equilibrium Price
59224
Indicative Equilibrium Volume
6403.88K

Returns comparison

Trailing returns across standard periods

Top news

Latest headlines on both assets

GRPH
View details
KRAS
View details

About Griptha Putra Persada Tbk.

PT Griptha Putra Persada Tbk (the Company), was established based on Notarial Deed No. 26 dated April 14, 2010 of Drs. Ika Slamet Riyono, S.H., notary in Kudus. The Company started its commercial operation in July 1, 2015. The Company’s immediate parent company is PT Mulia Jaya Palma and the ultimate controlling shareholder of the Company is Samuel Jeffrey Christiawan Soegeng.

Read more on GRPH

About Krakatau Steel (Persero) Tbk.

PT Krakatau Steel (Persero) was established on August 31, 1970 as a result of Indonesian Government Regulation No. 35 in the year 1970 regarding is equity establishment. The establishment of this steel industry was started by utilizing the left over machinery of the former Russian initiated Trikora Steel Project, mainly on cold wire drawing, bar mill, and section mill.These plants were officially opened by the President of Republic Indonesia in 1977.In 1979, the operation of the facilities such as direct reduction plant (with the capacity of 1.5 million tons per annum), billet steel plant (with the capacity of 500,000 tons per annum), wire rod mill (with the capacity of 220,000 tons per annum) and infrastructure such as a steam power plant (400MW), water purifying installation, port of Cigading and telecommunications system were officially opened.In 1983 relatively large scale plants also formally started their operation, they are slab steel plant and hot strip mill.This was followed in 1991 by a merger of a cold rolling mill plant in Cilegon industrial zone, to become the production unit of PT Krakatau Steel (Persero).

Read more on KRAS