Merdeka Gold Resources Tbk. vs Terregra Asia Energy Tbk. — how do they compare? Merdeka Gold Resources Tbk. trades at Rp8,750 (market cap 126.69T, 21.27M 24h volume), while Terregra Asia Energy Tbk. trades at Rp27 (market cap 74.25B). The key difference: Merdeka Gold Resources Tbk. is far larger — about 1706.3× Terregra Asia Energy Tbk.'s market cap. Which is the better fit depends on your goals.
| EMAS | TGRA | |
|---|---|---|
Market Cap | 126.69T | 74.25B |
Volume | 21.27M | — |
Lot | 212.69K | — |
Turnover | 185.05B | — |
Average Price | 8,700.43 | — |
Value | 185.05B | — |
Indicative Equilibrium Price | 8,750 | — |
Indicative Equilibrium Volume | 10.1K | — |
Trailing returns across standard periods
Latest headlines on both assets
PT Merdeka Gold Resources Tbk (formerly PT Pani Bersama Jaya) (the Company), was established in Republic of Indonesia based on Deed of Establishment No. 87 dated 20 November 2015 made before Humberg Lie, S.H., S.E., M.Kn., Notary in North Jakarta. The ultimate parent entity of the Company is PT Merdeka Copper Gold Tbk (MCG). Meanwhile, MCG is jointly controlled by PT Provident Capital Indonesia and PT Saratoga Investama Sedaya Tbk, which are respectively controlled by Winato Kartono and Edwin Soeryadjaya.
Read more on EMAS →PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.
Read more on TGRA →