Investment
Features
FeesSafety
Academy
More
Pluang+

Compare Lovina Beach Brewery Tbk. (STRK) vs Terregra Asia Energy Tbk. (TGRA) Price & Performance

Lovina Beach Brewery Tbk.Trade
Terregra Asia Energy Tbk.Trade

Price performance (Past 24H)

Key statistics

Lovina Beach Brewery Tbk. vs Terregra Asia Energy Tbk. — how do they compare? Lovina Beach Brewery Tbk. trades at Rp62 (market cap 675.48B, 3.92M 24h volume), while Terregra Asia Energy Tbk. trades at Rp27 (market cap 74.25B). The key difference: Lovina Beach Brewery Tbk. is far larger — about 9.1× Terregra Asia Energy Tbk.'s market cap. Which is the better fit depends on your goals.

STRKTGRA
Market Cap
675.48B74.25B
Volume
3.92M
Lot
39.18K
Turnover
242.11M
Average Price
61.8
Value
242.11M
Indicative Equilibrium Price
62
Indicative Equilibrium Volume
749

Returns comparison

Trailing returns across standard periods

Top news

Latest headlines on both assets

STRK
View details
TGRA
View details

About Lovina Beach Brewery Tbk.

PT Lovina Beach Brewery Tbk (the Company) was established based on the Notarial Deed of Notary of J.S Wibisono, S.H., in Denpasar, No. 42 dated October 19, 2010. The Company commenced its commercial operations in 2010

Read more on STRK

About Terregra Asia Energy Tbk.

PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.

Read more on TGRA