Investment
Features
FeesSafety
Academy
More
Pluang+

Compare Cikarang Listrindo Tbk. (POWR) vs Prodia Diagnostic Line Tbk (PRDL) Price & Performance

Cikarang Listrindo Tbk.Trade
Prodia Diagnostic Line TbkTrade

Price performance (Past 24H)

Key statistics

Cikarang Listrindo Tbk. vs Prodia Diagnostic Line Tbk — how do they compare? Cikarang Listrindo Tbk. trades at Rp995 (market cap 15.85T, 6.68M 24h volume), while Prodia Diagnostic Line Tbk trades at Rp236 (market cap 428.75B, 13.83M 24h volume). The key difference: Cikarang Listrindo Tbk. is far larger — about 37× Prodia Diagnostic Line Tbk's market cap, and Prodia Diagnostic Line Tbk is more actively traded (13.83M versus 6.68M). Which is the better fit depends on your goals.

POWRPRDL
Market Cap
15.85T428.75B
Volume
6.68M13.83M
Lot
66.83K138.27K
Turnover
6.57B3.27B
Average Price
983.72236.62
Value
6.57B3.27B
Indicative Equilibrium Price
995236
Indicative Equilibrium Volume
1.82K1.74K

Returns comparison

Trailing returns across standard periods

Top news

Latest headlines on both assets

POWR
View details
PRDL
View details

About Cikarang Listrindo Tbk.

PT Cikarang Listrindo Tbk (the Company) was established within the framework of the Domestic Investment Law No. 6 Year 1968 which was amended by Law No. 12 Year 1970, based on Notarial Deed No. 187 of Lukman Kirana, S.H., dated July 28, 1990. About 45 km southeast of Jakarta, starting in 1992, Cikarang Listrindo built its first power plant in the heart of Jababeka Industrial Estate and since then has set the pace for industrial development by providing its customers with a high quality supply of electricity. More than 2,000 customers in 5 industrial estates trust Cikarang Listrindo to deliver reliable and stable power. Among those customers are national and international manufacturers in such sectors as automobiles, electronics, plastics, food and chemicals. They include multinational firms such as PT Astra Honda Motor, PT Mattel Indonesia, PT Omron Manufacturing of Indonesia, PT Komatsu Undercarriage Indonesia, PT Mayora Indah, PT Aisin Indonesia, PT Yanmar Indonesia, PT AJE Indonesia, PT Mitsubishi Electric Automotive, PT Enkei Indonesia, PT Jotun Indonesia, PT Kao Indonesia, PT Kansai Paint Indonesia, PT Kayaba Indonesia and PT Showa Indonesia Manufacturing along with many leading national companies. To meet the industrial customers’ growing demand and to have a more reliable electricity supply system, in 2015 Cikarang Listrindo operates its additional power plant in Megalopolis Manunggal 2100 Industrial Town. Cikarang Listrindo has now a combined plant capacity of 864 MW. An expansion program to raise available power up to 1,144 MW is in progress. Besides satisfying the demand of its industrial customers the company exports power to the national electricity grid of PLN. The company is committed to providing all its customers with the highest level of service in meeting their needs for stable and reliable power. Seamless and smooth supply of electricity gives customers a significant advantage in their operations and affords a level of reliability unsurpassed in Indonesia’s energy market.

Read more on POWR

About Prodia Diagnostic Line Tbk

PT Prodia Diagnostic Line Tbk (the Company) was established April 16, 2010 with the name of PT DiaLine Systems Indonesia based on Notarial Deed No. 22 of Rismalena Kasri, S.H. On April 25, 2011, PT DiaLine Systems Indonesia changed the Companys name to PT Prodia Diagnostic Line based on Notarial Deed No. 14 of Rismalena Kasri, S.H. The Company is in the form of a Limited Liability Company in 2010 and began commercial production in 2011. The production results are marketed locally. The parent and ultimate parent entity of the Company is PT Prodia Utama.

Read more on PRDL