Investment
Features
FeesSafety
Academy
More
Pluang+

Compare Krakatau Steel (Persero) Tbk. (KRAS) vs Cikarang Listrindo Tbk. (POWR) Price & Performance

Krakatau Steel (Persero) Tbk.Trade
Cikarang Listrindo Tbk.Trade

Price performance (Past 24H)

Key statistics

Krakatau Steel (Persero) Tbk. vs Cikarang Listrindo Tbk. — how do they compare? Krakatau Steel (Persero) Tbk. trades at Rp230 (market cap 4.33T, 5.43M 24h volume), while Cikarang Listrindo Tbk. trades at Rp720 (market cap 11.58T, 619.7K 24h volume). The key difference: Cikarang Listrindo Tbk. is far larger — about 2.7× Krakatau Steel (Persero) Tbk.'s market cap, and Krakatau Steel (Persero) Tbk. is more actively traded (5.43M versus 619.7K). Which is the better fit depends on your goals.

KRASPOWR
Market Cap
4.33T11.58T
Volume
5.43M619.7K
Lot
54.27K6.2K
Turnover
1.24B445.47M
Average Price
228.12718.84
Value
1.24B445.47M
Indicative Equilibrium Price
230720
Indicative Equilibrium Volume
3.53K284

Returns comparison

Trailing returns across standard periods

Top news

Latest headlines on both assets

KRAS
View details
POWR
View details

About Krakatau Steel (Persero) Tbk.

PT Krakatau Steel (Persero) was established on August 31, 1970 as a result of Indonesian Government Regulation No. 35 in the year 1970 regarding is equity establishment. The establishment of this steel industry was started by utilizing the left over machinery of the former Russian initiated Trikora Steel Project, mainly on cold wire drawing, bar mill, and section mill.These plants were officially opened by the President of Republic Indonesia in 1977.In 1979, the operation of the facilities such as direct reduction plant (with the capacity of 1.5 million tons per annum), billet steel plant (with the capacity of 500,000 tons per annum), wire rod mill (with the capacity of 220,000 tons per annum) and infrastructure such as a steam power plant (400MW), water purifying installation, port of Cigading and telecommunications system were officially opened.In 1983 relatively large scale plants also formally started their operation, they are slab steel plant and hot strip mill.This was followed in 1991 by a merger of a cold rolling mill plant in Cilegon industrial zone, to become the production unit of PT Krakatau Steel (Persero).

Read more on KRAS

About Cikarang Listrindo Tbk.

PT Cikarang Listrindo Tbk (the Company) was established within the framework of the Domestic Investment Law No. 6 Year 1968 which was amended by Law No. 12 Year 1970, based on Notarial Deed No. 187 of Lukman Kirana, S.H., dated July 28, 1990. About 45 km southeast of Jakarta, starting in 1992, Cikarang Listrindo built its first power plant in the heart of Jababeka Industrial Estate and since then has set the pace for industrial development by providing its customers with a high quality supply of electricity. More than 2,000 customers in 5 industrial estates trust Cikarang Listrindo to deliver reliable and stable power. Among those customers are national and international manufacturers in such sectors as automobiles, electronics, plastics, food and chemicals. They include multinational firms such as PT Astra Honda Motor, PT Mattel Indonesia, PT Omron Manufacturing of Indonesia, PT Komatsu Undercarriage Indonesia, PT Mayora Indah, PT Aisin Indonesia, PT Yanmar Indonesia, PT AJE Indonesia, PT Mitsubishi Electric Automotive, PT Enkei Indonesia, PT Jotun Indonesia, PT Kao Indonesia, PT Kansai Paint Indonesia, PT Kayaba Indonesia and PT Showa Indonesia Manufacturing along with many leading national companies. To meet the industrial customers’ growing demand and to have a more reliable electricity supply system, in 2015 Cikarang Listrindo operates its additional power plant in Megalopolis Manunggal 2100 Industrial Town. Cikarang Listrindo has now a combined plant capacity of 864 MW. An expansion program to raise available power up to 1,144 MW is in progress. Besides satisfying the demand of its industrial customers the company exports power to the national electricity grid of PLN. The company is committed to providing all its customers with the highest level of service in meeting their needs for stable and reliable power. Seamless and smooth supply of electricity gives customers a significant advantage in their operations and affords a level of reliability unsurpassed in Indonesia’s energy market.

Read more on POWR