Investment
Features
FeesSafety
Academy
More
Pluang+

Compare Kirana Megatara Tbk. (KMTR) vs Krakatau Steel (Persero) Tbk. (KRAS) Price & Performance

Kirana Megatara Tbk.Trade
Krakatau Steel (Persero) Tbk.Trade

Price performance (Past 24H)

Key statistics

Kirana Megatara Tbk. vs Krakatau Steel (Persero) Tbk. — how do they compare? Kirana Megatara Tbk. trades at Rp228 (market cap 1.91T, 32.9K 24h volume), while Krakatau Steel (Persero) Tbk. trades at Rp222 (market cap 4.33T, 2.34M 24h volume). The key difference: Krakatau Steel (Persero) Tbk. is far larger — about 2.3× Kirana Megatara Tbk.'s market cap, and Krakatau Steel (Persero) Tbk. is more actively traded (2.34M versus 32.9K). Which is the better fit depends on your goals.

KMTRKRAS
Market Cap
1.91T4.33T
Volume
32.9K2.34M
Lot
32923.37K
Turnover
7.57M515.39M
Average Price
229.96220.52
Value
7.57M515.39M
Indicative Equilibrium Price
228222
Indicative Equilibrium Volume
10398

Returns comparison

Trailing returns across standard periods

Top news

Latest headlines on both assets

KMTR
View details
KRAS
View details

About Kirana Megatara Tbk.

PT. Kirana Megatara Tbk (the Company) was established based on Notarial Deed of Ny. Rukmasanti Hardjasatya, S.H., No. 63 dated 25 March 1991,

Read more on KMTR

About Krakatau Steel (Persero) Tbk.

PT Krakatau Steel (Persero) was established on August 31, 1970 as a result of Indonesian Government Regulation No. 35 in the year 1970 regarding is equity establishment. The establishment of this steel industry was started by utilizing the left over machinery of the former Russian initiated Trikora Steel Project, mainly on cold wire drawing, bar mill, and section mill.These plants were officially opened by the President of Republic Indonesia in 1977.In 1979, the operation of the facilities such as direct reduction plant (with the capacity of 1.5 million tons per annum), billet steel plant (with the capacity of 500,000 tons per annum), wire rod mill (with the capacity of 220,000 tons per annum) and infrastructure such as a steam power plant (400MW), water purifying installation, port of Cigading and telecommunications system were officially opened.In 1983 relatively large scale plants also formally started their operation, they are slab steel plant and hot strip mill.This was followed in 1991 by a merger of a cold rolling mill plant in Cilegon industrial zone, to become the production unit of PT Krakatau Steel (Persero).

Read more on KRAS