Investment
Features
FeesSafety
Academy
More
Pluang+

Compare Indika Energy Tbk. (INDY) vs Krakatau Steel (Persero) Tbk. (KRAS) Price & Performance

Indika Energy Tbk.Trade
Krakatau Steel (Persero) Tbk.Trade

Price performance (Past 24H)

Key statistics

Indika Energy Tbk. vs Krakatau Steel (Persero) Tbk. — how do they compare? Indika Energy Tbk. trades at Rp2,500 (market cap 12.92T, 30.69M 24h volume), while Krakatau Steel (Persero) Tbk. trades at Rp222 (market cap 4.33T, 2.34M 24h volume). The key difference: Indika Energy Tbk. is far larger — about 3× Krakatau Steel (Persero) Tbk.'s market cap, and Indika Energy Tbk. is more actively traded (30.69M versus 2.34M). Which is the better fit depends on your goals.

INDYKRAS
Market Cap
12.92T4.33T
Volume
30.69M2.34M
Lot
306.93K23.37K
Turnover
77.43B515.39M
Average Price
2,522.66220.52
Value
77.43B515.39M
Indicative Equilibrium Price
2,500222
Indicative Equilibrium Volume
5.29K398

Returns comparison

Trailing returns across standard periods

Top news

Latest headlines on both assets

INDY
View details
KRAS
View details

About Indika Energy Tbk.

Indika Energy, PT (the company) was established under its original name of Dipta Diwangkara on Oct 19, 2000 then changed to PT Indika Energy based on Notaries Deed dated Aug 13, 2004.The Company’s articles of association has been amended several times, most recently by notarial deed No. 115 of Sutjipto, S.H., dated Feb 25, 2008, concerning among others, the change in par value, the Company’s name, and public offering.

Read more on INDY

About Krakatau Steel (Persero) Tbk.

PT Krakatau Steel (Persero) was established on August 31, 1970 as a result of Indonesian Government Regulation No. 35 in the year 1970 regarding is equity establishment. The establishment of this steel industry was started by utilizing the left over machinery of the former Russian initiated Trikora Steel Project, mainly on cold wire drawing, bar mill, and section mill.These plants were officially opened by the President of Republic Indonesia in 1977.In 1979, the operation of the facilities such as direct reduction plant (with the capacity of 1.5 million tons per annum), billet steel plant (with the capacity of 500,000 tons per annum), wire rod mill (with the capacity of 220,000 tons per annum) and infrastructure such as a steam power plant (400MW), water purifying installation, port of Cigading and telecommunications system were officially opened.In 1983 relatively large scale plants also formally started their operation, they are slab steel plant and hot strip mill.This was followed in 1991 by a merger of a cold rolling mill plant in Cilegon industrial zone, to become the production unit of PT Krakatau Steel (Persero).

Read more on KRAS