Greenwood Sejahtera Tbk. vs Cikarang Listrindo Tbk. — how do they compare? Greenwood Sejahtera Tbk. trades at Rp122 (market cap 928.29B, 543.1K 24h volume), while Cikarang Listrindo Tbk. trades at Rp720 (market cap 11.58T, 250K 24h volume). The key difference: Cikarang Listrindo Tbk. is far larger — about 12.5× Greenwood Sejahtera Tbk.'s market cap, and Greenwood Sejahtera Tbk. is more actively traded (543.1K versus 250K). Which is the better fit depends on your goals.
| GWSA | POWR | |
|---|---|---|
Market Cap | 928.29B | 11.58T |
Volume | 543.1K | 250K |
Lot | 5.43K | 2.5K |
Turnover | 65.64M | 179.89M |
Average Price | 120.86 | 719.55 |
Value | 65.64M | 179.89M |
Indicative Equilibrium Price | 124 | 720 |
Indicative Equilibrium Volume | 25 | 23.2K |
Trailing returns across standard periods
Latest headlines on both assets
Greenwood Sejahtera is part of KG Global Development. On the begining, the company have a relation with Jababeka group, which own the land that has been used to builit TCC Batavia.PT Greenwood Sejahtera, company that developing The City Center Batavia (TCC Batavia), on December 23, 2011. The City Center Batavia is a superblock, mix used development project on top of 2,1 hectares of land. Its first tower is a skycrapper building: a tower with 46 storey, plus an 8 storey annex. According to the masterplan, Greenwood Sejahtera will build 3 tower on the site. The other tower will be completed in 2017 and the area will be expanded to 5.4 hectares. Its ground breaking ceremony is on September 12, 2009.
Read more on GWSA →PT Cikarang Listrindo Tbk (the Company) was established within the framework of the Domestic Investment Law No. 6 Year 1968 which was amended by Law No. 12 Year 1970, based on Notarial Deed No. 187 of Lukman Kirana, S.H., dated July 28, 1990. About 45 km southeast of Jakarta, starting in 1992, Cikarang Listrindo built its first power plant in the heart of Jababeka Industrial Estate and since then has set the pace for industrial development by providing its customers with a high quality supply of electricity. More than 2,000 customers in 5 industrial estates trust Cikarang Listrindo to deliver reliable and stable power. Among those customers are national and international manufacturers in such sectors as automobiles, electronics, plastics, food and chemicals. They include multinational firms such as PT Astra Honda Motor, PT Mattel Indonesia, PT Omron Manufacturing of Indonesia, PT Komatsu Undercarriage Indonesia, PT Mayora Indah, PT Aisin Indonesia, PT Yanmar Indonesia, PT AJE Indonesia, PT Mitsubishi Electric Automotive, PT Enkei Indonesia, PT Jotun Indonesia, PT Kao Indonesia, PT Kansai Paint Indonesia, PT Kayaba Indonesia and PT Showa Indonesia Manufacturing along with many leading national companies. To meet the industrial customers’ growing demand and to have a more reliable electricity supply system, in 2015 Cikarang Listrindo operates its additional power plant in Megalopolis Manunggal 2100 Industrial Town. Cikarang Listrindo has now a combined plant capacity of 864 MW. An expansion program to raise available power up to 1,144 MW is in progress. Besides satisfying the demand of its industrial customers the company exports power to the national electricity grid of PLN. The company is committed to providing all its customers with the highest level of service in meeting their needs for stable and reliable power. Seamless and smooth supply of electricity gives customers a significant advantage in their operations and affords a level of reliability unsurpassed in Indonesia’s energy market.
Read more on POWR →