Investment
Features
FeesSafety
Academy
More
Pluang+

Compare Esa Medika Mandiri Tbk. (EMMI) vs Terregra Asia Energy Tbk. (TGRA) Price & Performance

Esa Medika Mandiri Tbk.Trade
Terregra Asia Energy Tbk.Trade

Price performance (Past 24H)

Key statistics

Esa Medika Mandiri Tbk. vs Terregra Asia Energy Tbk. — how do they compare? Esa Medika Mandiri Tbk. trades at Rp348 (market cap 627.43B, 1.49M 24h volume), while Terregra Asia Energy Tbk. trades at Rp27 (market cap 74.25B). The key difference: Esa Medika Mandiri Tbk. is far larger — about 8.5× Terregra Asia Energy Tbk.'s market cap. Which is the better fit depends on your goals.

EMMITGRA
Market Cap
627.43B74.25B
Volume
1.49M
Lot
14.86K
Turnover
522.06M
Average Price
351.42
Value
522.06M
Indicative Equilibrium Price
348
Indicative Equilibrium Volume
1.55K

Returns comparison

Trailing returns across standard periods

Top news

Latest headlines on both assets

EMMI
View details
TGRA
View details

About Esa Medika Mandiri Tbk.

PT Esa Medika Mandiri Tbk (the Company) was established in the Republic of Indonesia based on Notarial Deed No. 1 of Tuti Setiahati K Soetoro SH dated January, 26 2000. The Company commenced commercial operations in 2000.

Read more on EMMI

About Terregra Asia Energy Tbk.

PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.

Read more on TGRA