Terregra Asia Energy Tbk. vs Trias Sentosa Tbk. — how do they compare? Terregra Asia Energy Tbk. trades at Rp27 (market cap 74.25B), while Trias Sentosa Tbk. trades at Rp462 (market cap 1.3T, 65.4K 24h volume). The key difference: Trias Sentosa Tbk. is far larger — about 17.5× Terregra Asia Energy Tbk.'s market cap. Which is the better fit depends on your goals.
| TGRA | TRST | |
|---|---|---|
Market Cap | 74.25B | 1.3T |
Volume | — | 65.4K |
Lot | — | 654 |
Turnover | — | 30.18M |
Average Price | — | 461.54 |
Value | — | 30.18M |
Indicative Equilibrium Price | — | 462 |
Indicative Equilibrium Volume | — | 435 |
Trailing returns across standard periods
Latest headlines on both assets
PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.
Read more on TGRA →PT Trias Sentosa Tbk was established on November 23, 1979 and started commercial operation in 1984 with total capacity of 4.500 tons BOPP (biaxially oriented polypropylene) film per annum. In 1989, the Company completed expansion of its second line BOPP film with capacity of 7.500 tons per annum. In 1993, the Company completed its expansion of third line BOPP film with capacity of 12.000 tons per annum, and in 1995, Polyester film project with total capacity of 12.000 tons were completed. In 1996, the Company completed its expansion of fourth line BOPP film with total capacity of 16.000 tons. Currently, the Company is the largest BOPP Film and Polyester Film producer in Indonesia.
Read more on TRST →