Investment
Features
FeesSafety
Academy
More
Pluang+

Compare Siantar Top Tbk. (STTP) vs Terregra Asia Energy Tbk. (TGRA) Price & Performance

Siantar Top Tbk.Trade
Terregra Asia Energy Tbk.Trade

Price performance (Past 24H)

Key statistics

Siantar Top Tbk. vs Terregra Asia Energy Tbk. — how do they compare? Siantar Top Tbk. trades at Rp9,450 (market cap 12.31T, 1K 24h volume), while Terregra Asia Energy Tbk. trades at Rp27 (market cap 74.25B). The key difference: Siantar Top Tbk. is far larger — about 165.8× Terregra Asia Energy Tbk.'s market cap. Which is the better fit depends on your goals.

STTPTGRA
Market Cap
12.31T74.25B
Volume
1K
Lot
10
Turnover
9.47M
Average Price
9,470
Value
9.47M

Returns comparison

Trailing returns across standard periods

Top news

Latest headlines on both assets

STTP
View details
TGRA
View details

About Siantar Top Tbk.

PT. Siantar Top Tbk (the Entity) was established based on Notarial Deed No. 45 dated May 12 1987 of Mrs. Endang Widjajanti, S.H., notary in Sidoarjo and was amended based on Notarial Deed No. 64 dated March 24, 1988 of the same notary.

Read more on STTP

About Terregra Asia Energy Tbk.

PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.

Read more on TGRA