Suryamas Dutamakmur Tbk. vs Terregra Asia Energy Tbk. — how do they compare? Suryamas Dutamakmur Tbk. trades at Rp550 (market cap 2.62T, 50.2K 24h volume), while Terregra Asia Energy Tbk. trades at Rp27 (market cap 74.25B). The key difference: Suryamas Dutamakmur Tbk. is far larger — about 35.3× Terregra Asia Energy Tbk.'s market cap. Which is the better fit depends on your goals.
| SMDM | TGRA | |
|---|---|---|
Market Cap | 2.62T | 74.25B |
Volume | 50.2K | — |
Lot | 502 | — |
Turnover | 26.74M | — |
Average Price | 532.67 | — |
Value | 26.74M | — |
Indicative Equilibrium Price | 550 | — |
Indicative Equilibrium Volume | 2 | — |
Trailing returns across standard periods
Latest headlines on both assets
PT Suryamas Dutamakmur Tbk (the Company) was established based on notarial Deed No. 322, dated September 21, 1989 of Benny Kristianto, S.H., notary in Jakarta. PT. Suryamas Dutamakmur has a specific aim to participate in meeting the growing demand for quality residential development in the Greater Jakarta area.
Read more on SMDM →PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.
Read more on TGRA →