Investment
Features
FeesSafety
Academy
More
Pluang+

Compare Sigma Energy Compressindo Tbk. (SICO) vs Terregra Asia Energy Tbk. (TGRA) Price & Performance

Sigma Energy Compressindo Tbk.Trade
Terregra Asia Energy Tbk.Trade

Price performance (Past 24H)

Key statistics

Sigma Energy Compressindo Tbk. vs Terregra Asia Energy Tbk. — how do they compare? Sigma Energy Compressindo Tbk. trades at Rp115 (market cap 104.66B, 2.22M 24h volume), while Terregra Asia Energy Tbk. trades at Rp27 (market cap 74.25B). The key difference: Sigma Energy Compressindo Tbk. is the larger of the two by market cap. Which is the better fit depends on your goals.

SICOTGRA
Market Cap
104.66B74.25B
Volume
2.22M
Lot
22.21K
Turnover
255.49M
Average Price
115.03
Value
255.49M
Indicative Equilibrium Price
115
Indicative Equilibrium Volume
104

Returns comparison

Trailing returns across standard periods

Top news

Latest headlines on both assets

SICO
View details
TGRA
View details

About Sigma Energy Compressindo Tbk.

PT Sigma Energy Compressindo Tbk Compressindo Tbk. (the Company) was established based on Deed No. 1 dated April 3, 2007 of Yendra Wiharja, S.H, notary in Tangerang. The Company commenced its commercial operations in 2007.

Read more on SICO

About Terregra Asia Energy Tbk.

PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.

Read more on TGRA