Investment
Features
FeesSafety
Academy
More
Pluang+

Compare Tripar Multivision Plus Tbk. (RAAM) vs Terregra Asia Energy Tbk. (TGRA) Price & Performance

Tripar Multivision Plus Tbk.Trade
Terregra Asia Energy Tbk.Trade

Price performance (Past 24H)

Key statistics

Tripar Multivision Plus Tbk. vs Terregra Asia Energy Tbk. — how do they compare? Tripar Multivision Plus Tbk. trades at Rp176 (market cap 1.23T, 1.26M 24h volume), while Terregra Asia Energy Tbk. trades at Rp27 (market cap 74.25B). The key difference: Tripar Multivision Plus Tbk. is far larger — about 16.6× Terregra Asia Energy Tbk.'s market cap. Which is the better fit depends on your goals.

RAAMTGRA
Market Cap
1.23T74.25B
Volume
1.26M
Lot
12.56K
Turnover
222.66M
Average Price
177.28
Value
222.66M
Indicative Equilibrium Price
176
Indicative Equilibrium Volume
1.39K

Returns comparison

Trailing returns across standard periods

Top news

Latest headlines on both assets

RAAM
View details
TGRA
View details

About Tripar Multivision Plus Tbk.

PT Tripar Multivision Plus Tbk (“the Company”) was establishedbased on Deed of Establishment of Limited Liability Company No. 17 dated 6 December 1990 drawn up before Adlan Yulizar, S.H., notary in Jakarta.

Read more on RAAM

About Terregra Asia Energy Tbk.

PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.

Read more on TGRA