Investment
Features
FeesSafety
Academy
More
Pluang+

Compare Pantai Indah Kapuk Dua Tbk. (PANI) vs Terregra Asia Energy Tbk. (TGRA) Price & Performance

Pantai Indah Kapuk Dua Tbk.Trade
Terregra Asia Energy Tbk.Trade

Price performance (Past 24H)

Key statistics

Pantai Indah Kapuk Dua Tbk. vs Terregra Asia Energy Tbk. — how do they compare? Pantai Indah Kapuk Dua Tbk. trades at Rp5,625 (market cap 104.59T, 7.93M 24h volume), while Terregra Asia Energy Tbk. trades at Rp27 (market cap 74.25B). The key difference: Pantai Indah Kapuk Dua Tbk. is far larger — about 1408.6× Terregra Asia Energy Tbk.'s market cap. Which is the better fit depends on your goals.

PANITGRA
Market Cap
104.59T74.25B
Volume
7.93M
Lot
79.3K
Turnover
44.77B
Average Price
5,645.79
Value
44.77B
Indicative Equilibrium Price
5,625
Indicative Equilibrium Volume
489

Returns comparison

Trailing returns across standard periods

Top news

Latest headlines on both assets

PANI
View details
TGRA
View details

About Pantai Indah Kapuk Dua Tbk.

PT Pratama Abadi Nusa Industri (the Company) was established based on Notarial Deed No. 13 dated September 8, 2000 of Notary Ivonne Barnetha Sinyal, SH.

Read more on PANI

About Terregra Asia Energy Tbk.

PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.

Read more on TGRA