Investment
Features
FeesSafety
Academy
More
Pluang+

Compare Bima Sakti Pertiwi Tbk. (PAMG) vs Terregra Asia Energy Tbk. (TGRA) Price & Performance

Bima Sakti Pertiwi Tbk.Trade
Terregra Asia Energy Tbk.Trade

Price performance (Past 24H)

Key statistics

Bima Sakti Pertiwi Tbk. vs Terregra Asia Energy Tbk. — how do they compare? Bima Sakti Pertiwi Tbk. trades at Rp56 (market cap 175B, 6.26M 24h volume), while Terregra Asia Energy Tbk. trades at Rp27 (market cap 74.25B). The key difference: Bima Sakti Pertiwi Tbk. is far larger — about 2.4× Terregra Asia Energy Tbk.'s market cap. Which is the better fit depends on your goals.

PAMGTGRA
Market Cap
175B74.25B
Volume
6.26M
Lot
62.6K
Turnover
346.31M
Average Price
55.32
Value
346.31M
Indicative Equilibrium Price
56
Indicative Equilibrium Volume
2.3K

Returns comparison

Trailing returns across standard periods

Top news

Latest headlines on both assets

PAMG
View details
TGRA
View details

About Bima Sakti Pertiwi Tbk.

PT Bima Sakti Pertiwi Tbk (the Company) was established based on the Notarial Deed of Raden Minarno Hardjokoesoemo, S.H., Deputy Notary in Tanjungpinang, No. 30, dated April 28, 1980.

Read more on PAMG

About Terregra Asia Energy Tbk.

PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.

Read more on TGRA