Merdeka Battery Materials Tbk. vs Terregra Asia Energy Tbk. — how do they compare? Merdeka Battery Materials Tbk. trades at Rp520 (market cap 57.24T, 89.37M 24h volume), while Terregra Asia Energy Tbk. trades at Rp27 (market cap 74.25B). The key difference: Merdeka Battery Materials Tbk. is far larger — about 770.9× Terregra Asia Energy Tbk.'s market cap. Which is the better fit depends on your goals.
| MBMA | TGRA | |
|---|---|---|
Market Cap | 57.24T | 74.25B |
Volume | 89.37M | — |
Lot | 893.72K | — |
Turnover | 46.3B | — |
Average Price | 518.08 | — |
Value | 46.3B | — |
Indicative Equilibrium Price | 520 | — |
Indicative Equilibrium Volume | 90.42K | — |
Trailing returns across standard periods
Latest headlines on both assets
PT Merdeka Battery Materials Tbk (formerly PT Hamparan Logistik Nusantara) (the “Company”) was established based on Notarial Deed No. 66 of Darmawan Tjoa, S.H., S.E., Notary in Jakarta, dated 20 August 2019. The Company’s immediate parent entity is PT Merdeka Energi Nusantara (formerlyPT Batutua Tambang Abadi) (“MEN”) and its ultimate parent entity is PT Merdeka Copper Gold Tbk (“MDKA”), a company incorporated in Indonesia and listed on the Indonesian Stock Exchange (“IDX”).
Read more on MBMA →PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.
Read more on TGRA →