PP London Sumatra Indonesia Tbk. vs Terregra Asia Energy Tbk. — how do they compare? PP London Sumatra Indonesia Tbk. trades at Rp1,700 (market cap 11.49T, 15.99M 24h volume), while Terregra Asia Energy Tbk. trades at Rp27 (market cap 74.25B). The key difference: PP London Sumatra Indonesia Tbk. is far larger — about 154.7× Terregra Asia Energy Tbk.'s market cap. Which is the better fit depends on your goals.
| LSIP | TGRA | |
|---|---|---|
Market Cap | 11.49T | 74.25B |
Volume | 15.99M | — |
Lot | 159.9K | — |
Turnover | 27.34B | — |
Average Price | 1,710.03 | — |
Value | 27.34B | — |
Indicative Equilibrium Price | 1,700 | — |
Indicative Equilibrium Volume | 2.92K | — |
Trailing returns across standard periods
Latest headlines on both assets
PT Perusahaan Perkebunan London Sumatera Tbk abbreviated as Lonsum, was established in teh Republic of Indonesia based on Notarial Deed No. 93 of Raden Kadiman dated December 18, 1962 and amended by Notarial Deed No. 20 dated September 9, 1963. Based on Notarial Deed No. 18 of Pahala Sutrisno Amijoyo Tampubolon, S.H., M.Kn., dated May 24, 2013, the Company's shareholders approved the change of the Company's status from Foreign Capital Investment (PMA) company to Domestic Capital Investment (PMDN) company.
Read more on LSIP →PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.
Read more on TGRA →