MNC Land Tbk. vs Krakatau Steel (Persero) Tbk. — how do they compare? MNC Land Tbk. trades at Rp88 (market cap 8.8T, 150.31M 24h volume), while Krakatau Steel (Persero) Tbk. trades at Rp230 (market cap 4.33T, 5.43M 24h volume). The key difference: MNC Land Tbk. is far larger — about 2× Krakatau Steel (Persero) Tbk.'s market cap, and MNC Land Tbk. is more actively traded (150.31M versus 5.43M). Which is the better fit depends on your goals.
| KPIG | KRAS | |
|---|---|---|
Market Cap | 8.8T | 4.33T |
Volume | 150.31M | 5.43M |
Lot | 1.5M | 54.27K |
Turnover | 12.43B | 1.24B |
Average Price | 82.68 | 228.12 |
Value | 12.43B | 1.24B |
Indicative Equilibrium Price | 88 | 230 |
Indicative Equilibrium Volume | 154.99K | 3.53K |
Trailing returns across standard periods
Latest headlines on both assets
PT MNC Land Tbk, formerly PT Global Land Development Tbk ( PT Kridaperdana Indahgraha Tbk ) was established based on Notarial Deed No. 65 dated June 11, 1990 of Achmad Fatimah, S.H., a substitute notary of Imas Fatimah, S.H., notary in Jakarta as amended by deed No. 72 dated October 19, 1990 of Imas Fatimah, S.H., notary in Jakarta. Subsequently, the notarial deed was amended by deed No. 129 dated June 26, 1991 of Achmad Bajumi, S.H., substitute notary of Imas Fatimah, S.H., notary in Jakarta.
Read more on KPIG →PT Krakatau Steel (Persero) was established on August 31, 1970 as a result of Indonesian Government Regulation No. 35 in the year 1970 regarding is equity establishment. The establishment of this steel industry was started by utilizing the left over machinery of the former Russian initiated Trikora Steel Project, mainly on cold wire drawing, bar mill, and section mill.These plants were officially opened by the President of Republic Indonesia in 1977.In 1979, the operation of the facilities such as direct reduction plant (with the capacity of 1.5 million tons per annum), billet steel plant (with the capacity of 500,000 tons per annum), wire rod mill (with the capacity of 220,000 tons per annum) and infrastructure such as a steam power plant (400MW), water purifying installation, port of Cigading and telecommunications system were officially opened.In 1983 relatively large scale plants also formally started their operation, they are slab steel plant and hot strip mill.This was followed in 1991 by a merger of a cold rolling mill plant in Cilegon industrial zone, to become the production unit of PT Krakatau Steel (Persero).
Read more on KRAS →