Investment
Features
FeesSafety
Academy
More
Pluang+

Compare Mitra Energi Persada Tbk. (KOPI) vs Krakatau Steel (Persero) Tbk. (KRAS) Price & Performance

Mitra Energi Persada Tbk.Trade
Krakatau Steel (Persero) Tbk.Trade

Price performance (Past 24H)

Key statistics

Mitra Energi Persada Tbk. vs Krakatau Steel (Persero) Tbk. — how do they compare? Mitra Energi Persada Tbk. trades at Rp210 (market cap 133.18B, 2.76M 24h volume), while Krakatau Steel (Persero) Tbk. trades at Rp230 (market cap 4.33T, 5.43M 24h volume). The key difference: Krakatau Steel (Persero) Tbk. is far larger — about 32.5× Mitra Energi Persada Tbk.'s market cap, and Krakatau Steel (Persero) Tbk. is more actively traded (5.43M versus 2.76M). Which is the better fit depends on your goals.

KOPIKRAS
Market Cap
133.18B4.33T
Volume
2.76M5.43M
Lot
27.6K54.27K
Turnover
577.73M1.24B
Average Price
209.34228.12
Value
577.73M1.24B
Indicative Equilibrium Price
210230
Indicative Equilibrium Volume
1.17K3.53K

Returns comparison

Trailing returns across standard periods

Top news

Latest headlines on both assets

KOPI
View details
KRAS
View details

About Mitra Energi Persada Tbk.

PT Mitra Energi Persada Tbk (formerly PT Korpora Persada Investama, Tbk) (the "Company") a public listed company registered in Indonesia Stock Exchange) was first established under the name of Adwitiya Alembana an Advertising Company, drawn up before notary Kartini Muljadi, SH No. 200 dated 24 February 1981. The Company is domiciled in Jakarta and started operations since 1982.

Read more on KOPI

About Krakatau Steel (Persero) Tbk.

PT Krakatau Steel (Persero) was established on August 31, 1970 as a result of Indonesian Government Regulation No. 35 in the year 1970 regarding is equity establishment. The establishment of this steel industry was started by utilizing the left over machinery of the former Russian initiated Trikora Steel Project, mainly on cold wire drawing, bar mill, and section mill.These plants were officially opened by the President of Republic Indonesia in 1977.In 1979, the operation of the facilities such as direct reduction plant (with the capacity of 1.5 million tons per annum), billet steel plant (with the capacity of 500,000 tons per annum), wire rod mill (with the capacity of 220,000 tons per annum) and infrastructure such as a steam power plant (400MW), water purifying installation, port of Cigading and telecommunications system were officially opened.In 1983 relatively large scale plants also formally started their operation, they are slab steel plant and hot strip mill.This was followed in 1991 by a merger of a cold rolling mill plant in Cilegon industrial zone, to become the production unit of PT Krakatau Steel (Persero).

Read more on KRAS