Investment
Features
FeesSafety
Academy
More
Pluang+

Compare Kokoh Exa Nusantara Tbk (KOCI) vs Terregra Asia Energy Tbk. (TGRA) Price & Performance

Kokoh Exa Nusantara TbkTrade
Terregra Asia Energy Tbk.Trade

Price performance (Past 24H)

Key statistics

Kokoh Exa Nusantara Tbk vs Terregra Asia Energy Tbk. — how do they compare? Kokoh Exa Nusantara Tbk trades at Rp134 (market cap 576.31B, 60.42M 24h volume), while Terregra Asia Energy Tbk. trades at Rp27 (market cap 74.25B). The key difference: Kokoh Exa Nusantara Tbk is far larger — about 7.8× Terregra Asia Energy Tbk.'s market cap. Which is the better fit depends on your goals.

KOCITGRA
Market Cap
576.31B74.25B
Volume
60.42M
Lot
604.22K
Turnover
7.95B
Average Price
131.63
Value
7.95B
Indicative Equilibrium Price
134
Indicative Equilibrium Volume
5.59K

Returns comparison

Trailing returns across standard periods

Top news

Latest headlines on both assets

KOCI
View details
TGRA
View details

About Kokoh Exa Nusantara Tbk

PT Kokoh Exa Nusantara Tbk (the Entity) was established based on Notarial Deed No. 173, dated July 31, 2019 of Dwi Rossulliati, S.H., notary in Mojokerto Regency. The Entity started its commercial operations in 2020. PT Exa Nusa Persada is its ultimate parent entity.

Read more on KOCI

About Terregra Asia Energy Tbk.

PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.

Read more on TGRA