Investment
Features
FeesSafety
Academy
More
Pluang+

Compare Ketrosden Triasmitra Tbk. (KETR) vs Krakatau Steel (Persero) Tbk. (KRAS) Price & Performance

Ketrosden Triasmitra Tbk.Trade
Krakatau Steel (Persero) Tbk.Trade

Price performance (Past 24H)

Key statistics

Ketrosden Triasmitra Tbk. vs Krakatau Steel (Persero) Tbk. — how do they compare? Ketrosden Triasmitra Tbk. trades at Rp955 (market cap 2.64T, 92.24M 24h volume), while Krakatau Steel (Persero) Tbk. trades at Rp238 (market cap 4.72T, 3.72M 24h volume). The key difference: Krakatau Steel (Persero) Tbk. is the larger of the two by market cap, and Ketrosden Triasmitra Tbk. is more actively traded (92.24M versus 3.72M). Which is the better fit depends on your goals.

KETRKRAS
Market Cap
2.64T4.72T
Volume
92.24M3.72M
Lot
922.38K37.21K
Turnover
90.37B889.74M
Average Price
979.8239.1
Value
90.37B889.74M
Indicative Equilibrium Price
955238
Indicative Equilibrium Volume
29.3K1.03K

Returns comparison

Trailing returns across standard periods

Top news

Latest headlines on both assets

KETR
View details
KRAS
View details

About Ketrosden Triasmitra Tbk.

PT Ketrosden Triasmitra Tbk was established base on Notarial Deed No.179 of Pudji Redjeki Irawati S.H., dated November 25, 1994.

Read more on KETR

About Krakatau Steel (Persero) Tbk.

PT Krakatau Steel (Persero) was established on August 31, 1970 as a result of Indonesian Government Regulation No. 35 in the year 1970 regarding is equity establishment. The establishment of this steel industry was started by utilizing the left over machinery of the former Russian initiated Trikora Steel Project, mainly on cold wire drawing, bar mill, and section mill.These plants were officially opened by the President of Republic Indonesia in 1977.In 1979, the operation of the facilities such as direct reduction plant (with the capacity of 1.5 million tons per annum), billet steel plant (with the capacity of 500,000 tons per annum), wire rod mill (with the capacity of 220,000 tons per annum) and infrastructure such as a steam power plant (400MW), water purifying installation, port of Cigading and telecommunications system were officially opened.In 1983 relatively large scale plants also formally started their operation, they are slab steel plant and hot strip mill.This was followed in 1991 by a merger of a cold rolling mill plant in Cilegon industrial zone, to become the production unit of PT Krakatau Steel (Persero).

Read more on KRAS