KMI Wire Cable Tbk vs Krakatau Steel (Persero) Tbk. — how do they compare? KMI Wire Cable Tbk trades at Rp322 (market cap 1.3T, 203.2K 24h volume), while Krakatau Steel (Persero) Tbk. trades at Rp230 (market cap 4.33T, 5.43M 24h volume). The key difference: Krakatau Steel (Persero) Tbk. is far larger — about 3.3× KMI Wire Cable Tbk's market cap, and Krakatau Steel (Persero) Tbk. is more actively traded (5.43M versus 203.2K). Which is the better fit depends on your goals.
| KBLI | KRAS | |
|---|---|---|
Market Cap | 1.3T | 4.33T |
Volume | 203.2K | 5.43M |
Lot | 2.03K | 54.27K |
Turnover | 65.75M | 1.24B |
Average Price | 323.58 | 228.12 |
Value | 65.75M | 1.24B |
Indicative Equilibrium Price | 326 | 230 |
Indicative Equilibrium Volume | 38 | 3.53K |
Trailing returns across standard periods
Latest headlines on both assets
PT KMI Wire and Cable Tbk (the Company) formerly PT. GT Kabel Indonesia is one of the largest telecommunications and power cable producer. It is owned 53% by Gadjah Tunggal Group. It was established in 1972 by Electro GmbH of Germany (today known as Alcatel Kabelmetal) and PT Gunung Ngadeg Djaya.The Company was established wtihin the framework of the Foreign Capital Investment Law No. 1 year 1967 as amended by Law No. 11 year 1970, based on deed No. 42 dated January 19, 1972 of Djojo Muljadi, SH, notary in Jakarta
Read more on KBLI →PT Krakatau Steel (Persero) was established on August 31, 1970 as a result of Indonesian Government Regulation No. 35 in the year 1970 regarding is equity establishment. The establishment of this steel industry was started by utilizing the left over machinery of the former Russian initiated Trikora Steel Project, mainly on cold wire drawing, bar mill, and section mill.These plants were officially opened by the President of Republic Indonesia in 1977.In 1979, the operation of the facilities such as direct reduction plant (with the capacity of 1.5 million tons per annum), billet steel plant (with the capacity of 500,000 tons per annum), wire rod mill (with the capacity of 220,000 tons per annum) and infrastructure such as a steam power plant (400MW), water purifying installation, port of Cigading and telecommunications system were officially opened.In 1983 relatively large scale plants also formally started their operation, they are slab steel plant and hot strip mill.This was followed in 1991 by a merger of a cold rolling mill plant in Cilegon industrial zone, to become the production unit of PT Krakatau Steel (Persero).
Read more on KRAS →