Sky Energy Indonesia Tbk. vs Krakatau Steel (Persero) Tbk. — how do they compare? Sky Energy Indonesia Tbk. trades at Rp52 (market cap 105.69B), while Krakatau Steel (Persero) Tbk. trades at Rp238 (market cap 4.72T, 3.72M 24h volume). The key difference: Krakatau Steel (Persero) Tbk. is far larger — about 44.7× Sky Energy Indonesia Tbk.'s market cap. Which is the better fit depends on your goals.
| JSKY | KRAS | |
|---|---|---|
Market Cap | 105.69B | 4.72T |
Volume | — | 3.72M |
Lot | — | 37.21K |
Turnover | — | 889.74M |
Average Price | — | 239.1 |
Value | — | 889.74M |
Indicative Equilibrium Price | — | 238 |
Indicative Equilibrium Volume | — | 1.03K |
Trailing returns across standard periods
Latest headlines on both assets
PT Sky Energy Indonesia (the Entity) was established based on Notarial Deed No. 6, dated July 4, 2008 of Petrus Suandi Halim, S.H., notary in Jakarta. Initially the Entity engaged as distributor of solar modules and provider of System Integration technical services for the manufacture of Pembangkit Listrik Tenaga Surya (PLTS) On-grid and Off-grid types, including technical design, installation and maintenance. in 2009 the Entity cooperated with PT Hitachi High-Technologies Indonesia to establish an international-class solar module manufacturing facility. In the year of 2012, the Entity commenced the production of solar modules with a capacity of 10 MW. By 2016, The Entity has grown to become the largest producer of solar modules in Indonesia with capacity production of 100 MW for solar modules and 50 MW for solar cells.
Read more on JSKY →PT Krakatau Steel (Persero) was established on August 31, 1970 as a result of Indonesian Government Regulation No. 35 in the year 1970 regarding is equity establishment. The establishment of this steel industry was started by utilizing the left over machinery of the former Russian initiated Trikora Steel Project, mainly on cold wire drawing, bar mill, and section mill.These plants were officially opened by the President of Republic Indonesia in 1977.In 1979, the operation of the facilities such as direct reduction plant (with the capacity of 1.5 million tons per annum), billet steel plant (with the capacity of 500,000 tons per annum), wire rod mill (with the capacity of 220,000 tons per annum) and infrastructure such as a steam power plant (400MW), water purifying installation, port of Cigading and telecommunications system were officially opened.In 1983 relatively large scale plants also formally started their operation, they are slab steel plant and hot strip mill.This was followed in 1991 by a merger of a cold rolling mill plant in Cilegon industrial zone, to become the production unit of PT Krakatau Steel (Persero).
Read more on KRAS →