Investment
Features
FeesSafety
Academy
More
Pluang+

Compare Indocement Tunggal Prakarsa Tbk (INTP) vs TBS Energi Utama Tbk. (TOBA) Price & Performance

Indocement Tunggal Prakarsa TbkTrade
TBS Energi Utama Tbk.Trade

Price performance (Past 24H)

Key statistics

Indocement Tunggal Prakarsa Tbk vs TBS Energi Utama Tbk. — how do they compare? Indocement Tunggal Prakarsa Tbk trades at Rp4,700 (market cap 16.14T, 783.2K 24h volume), while TBS Energi Utama Tbk. trades at Rp462 (market cap 3.83T, 13.71M 24h volume). The key difference: Indocement Tunggal Prakarsa Tbk is far larger — about 4.2× TBS Energi Utama Tbk.'s market cap, and TBS Energi Utama Tbk. is more actively traded (13.71M versus 783.2K). Which is the better fit depends on your goals.

INTPTOBA
Market Cap
16.14T3.83T
Volume
783.2K13.71M
Lot
7.83K137.09K
Turnover
3.66B6.3B
Average Price
4,667.02459.44
Value
3.66B6.3B
Indicative Equilibrium Price
4,700462
Indicative Equilibrium Volume
4434.19K

Returns comparison

Trailing returns across standard periods

Top news

Latest headlines on both assets

INTP
View details
TOBA
View details

About Indocement Tunggal Prakarsa Tbk

PT Indocement Tungggal Prakarsa Tbk (The company) was incorporated in Indonesia on January 16, 1985 and the Ministry of Justice approved its deed of incorporation on May 17, 1985. The company’s articles of association have been amended from time to time, the latest of which was covered by notarial deed on august 21, 1997. The amendments made are primarily intended to align the company’s articles of association with the new corporate law No. 1 year 1995. The company started its commercial operations in 1985. the company is domiciled in Jakarta, while its factories are located in Citeureup and Cirebon, West Java. The company and its subsidiaries were a multibusiness group divided into Cement Business as the Group core business, and Other business. The Cement business mainly includes the operation of the eight integrated cement plants at its Citeureup-Bogor site, two integrated cement plants at its Palimanan - Cirebon site with a combined annual capacity of 10.9 million tons, consisting of 10.7 million tons of portland cement and 0.2 million tons of specialty (white and oil well) cements, and its ready mix concrete manufacturing subsudiary. Other business includes, among others, the operations of the company-owned property, Wisma Indosemen, a 23 storey office tower building with over 19,000 square meters of rentable space and two basement car parks and PT Wisma Nusantara International, an equitized subsidiary which owns and operates a 30 storey office building with 26,108 square meters of rentable space and President Hotel, a four star Hotel with 315 rooms. The above mentioned building are located in Jakarta’s central commercial district.

Read more on INTP

About TBS Energi Utama Tbk.

PT Toba Bara Sejahtra (The Company) Tbk was established in Indonesia as PT Buana Persada Gemilang based on the Deed No. 1 dated August 3, 2007 made before Tintin Surtini, S.H., M.Kn, as asubstitute notary of Surjadi, S.H., Jakarta.

Read more on TOBA