Investment
Features
FeesSafety
Academy
More
Pluang+

Compare Inter Delta Tbk (INTD) vs Terregra Asia Energy Tbk. (TGRA) Price & Performance

Inter Delta TbkTrade
Terregra Asia Energy Tbk.Trade

Price performance (Past 24H)

Key statistics

Inter Delta Tbk vs Terregra Asia Energy Tbk. — how do they compare? Inter Delta Tbk trades at Rp264 (market cap 155.06B, 30K 24h volume), while Terregra Asia Energy Tbk. trades at Rp27 (market cap 74.25B). The key difference: Inter Delta Tbk is far larger — about 2.1× Terregra Asia Energy Tbk.'s market cap. Which is the better fit depends on your goals.

INTDTGRA
Market Cap
155.06B74.25B
Volume
30K
Lot
300
Turnover
7.86M
Average Price
261.94
Value
7.86M
Indicative Equilibrium Price
268
Indicative Equilibrium Volume
9

Returns comparison

Trailing returns across standard periods

Top news

Latest headlines on both assets

INTD
View details
TGRA
View details

About Inter Delta Tbk

PT Inter Delta Tbk (the Company) was established based on Notarial Deed No. 119 of Kartini Muljadi, S.H., dated November 15, 1976. On December 2, 1996, the company changed its name to PT Inter Delta Tbk.

Read more on INTD

About Terregra Asia Energy Tbk.

PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.

Read more on TGRA