Investment
Features
FeesSafety
Academy
More
Pluang+

Compare Inter Delta Tbk (INTD) vs Krakatau Steel (Persero) Tbk. (KRAS) Price & Performance

Inter Delta TbkTrade
Krakatau Steel (Persero) Tbk.Trade

Price performance (Past 24H)

Key statistics

Inter Delta Tbk vs Krakatau Steel (Persero) Tbk. — how do they compare? Inter Delta Tbk trades at Rp230 (market cap 137.3B, 11.3K 24h volume), while Krakatau Steel (Persero) Tbk. trades at Rp230 (market cap 4.33T, 5.43M 24h volume). The key difference: Krakatau Steel (Persero) Tbk. is far larger — about 31.5× Inter Delta Tbk's market cap, and Krakatau Steel (Persero) Tbk. is more actively traded (5.43M versus 11.3K). Which is the better fit depends on your goals.

INTDKRAS
Market Cap
137.3B4.33T
Volume
11.3K5.43M
Lot
11354.27K
Turnover
2.6M1.24B
Average Price
230.51228.12
Value
2.6M1.24B
Indicative Equilibrium Price
230
Indicative Equilibrium Volume
3.53K

Returns comparison

Trailing returns across standard periods

Top news

Latest headlines on both assets

INTD
View details
KRAS
View details

About Inter Delta Tbk

PT Inter Delta Tbk (the Company) was established based on Notarial Deed No. 119 of Kartini Muljadi, S.H., dated November 15, 1976. On December 2, 1996, the company changed its name to PT Inter Delta Tbk.

Read more on INTD

About Krakatau Steel (Persero) Tbk.

PT Krakatau Steel (Persero) was established on August 31, 1970 as a result of Indonesian Government Regulation No. 35 in the year 1970 regarding is equity establishment. The establishment of this steel industry was started by utilizing the left over machinery of the former Russian initiated Trikora Steel Project, mainly on cold wire drawing, bar mill, and section mill.These plants were officially opened by the President of Republic Indonesia in 1977.In 1979, the operation of the facilities such as direct reduction plant (with the capacity of 1.5 million tons per annum), billet steel plant (with the capacity of 500,000 tons per annum), wire rod mill (with the capacity of 220,000 tons per annum) and infrastructure such as a steam power plant (400MW), water purifying installation, port of Cigading and telecommunications system were officially opened.In 1983 relatively large scale plants also formally started their operation, they are slab steel plant and hot strip mill.This was followed in 1991 by a merger of a cold rolling mill plant in Cilegon industrial zone, to become the production unit of PT Krakatau Steel (Persero).

Read more on KRAS