Indomobil Multi Jasa Tbk. vs Terregra Asia Energy Tbk. — how do they compare? Indomobil Multi Jasa Tbk. trades at Rp183 (market cap 2.02T, 2.92M 24h volume), while Terregra Asia Energy Tbk. trades at Rp27 (market cap 74.25B). The key difference: Indomobil Multi Jasa Tbk. is far larger — about 27.2× Terregra Asia Energy Tbk.'s market cap. Which is the better fit depends on your goals.
| IMJS | TGRA | |
|---|---|---|
Market Cap | 2.02T | 74.25B |
Volume | 2.92M | — |
Lot | 29.25K | — |
Turnover | 530.02M | — |
Average Price | 181.23 | — |
Value | 530.02M | — |
Indicative Equilibrium Price | 183 | — |
Indicative Equilibrium Volume | 215 | — |
Trailing returns across standard periods
Latest headlines on both assets
PT. Indomobil Multi Jasa (the "Company") was established on December 14, 2004 as PT Multi Tambang Abadi (MTA) based on Notarial Deed No.67 of Aulia Taufani, S.H., substitute of Sutjipto, S.H.The Company's articles of assosiation has been amended several times. Based on Notarial Deed No.56 of Ir. Nanette Cahyanie Handari Adi Warsito, S.H., dated February 13, 2013 which has been approved by the Minister of Laws and Human Rights of the Republic od Indonesia in its Decision Letter No. AHU-09669.A.H.01.02. Year 2013 dated February 28, 2013, the articles of association of the Company has been amended concerning among others.
Read more on IMJS →PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.
Read more on TGRA →