Investment
Features
FeesSafety
Academy
More
Pluang+

Compare Era Mandiri Cemerlang Tbk. (IKAN) vs Terregra Asia Energy Tbk. (TGRA) Price & Performance

Era Mandiri Cemerlang Tbk.Trade
Terregra Asia Energy Tbk.Trade

Price performance (Past 24H)

Key statistics

Era Mandiri Cemerlang Tbk. vs Terregra Asia Energy Tbk. — how do they compare? Era Mandiri Cemerlang Tbk. trades at Rp90 (market cap 75.83B, 8.23M 24h volume), while Terregra Asia Energy Tbk. trades at Rp27 (market cap 74.25B). The key difference: Era Mandiri Cemerlang Tbk. and Terregra Asia Energy Tbk. are close in size by market cap. Which is the better fit depends on your goals.

IKANTGRA
Market Cap
75.83B74.25B
Volume
8.23M
Lot
82.29K
Turnover
741.24M
Average Price
90.07
Value
741.24M
Indicative Equilibrium Price
90
Indicative Equilibrium Volume
311

Returns comparison

Trailing returns across standard periods

Top news

Latest headlines on both assets

IKAN
View details
TGRA
View details

About Era Mandiri Cemerlang Tbk.

PT Era Mandiri Cemerlang Tbk ("Company") was established with Deed Number 79, 14 November 2000 by Haji Muhammad Afdal Gazali, SH., a public notary in Jakarta.

Read more on IKAN

About Terregra Asia Energy Tbk.

PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.

Read more on TGRA