Investment
Features
FeesSafety
Academy
More
Pluang+

Compare Medikaloka Hermina Tbk. (HEAL) vs Krakatau Steel (Persero) Tbk. (KRAS) Price & Performance

Medikaloka Hermina Tbk.Trade
Krakatau Steel (Persero) Tbk.Trade

Price performance (Past 24H)

Key statistics

Medikaloka Hermina Tbk. vs Krakatau Steel (Persero) Tbk. — how do they compare? Medikaloka Hermina Tbk. trades at Rp715 (market cap 10.83T, 8.01M 24h volume), while Krakatau Steel (Persero) Tbk. trades at Rp220 (market cap 4.29T, 1.93M 24h volume). The key difference: Medikaloka Hermina Tbk. is far larger — about 2.5× Krakatau Steel (Persero) Tbk.'s market cap, and Medikaloka Hermina Tbk. is more actively traded (8.01M versus 1.93M). Which is the better fit depends on your goals.

HEALKRAS
Market Cap
10.83T4.29T
Volume
8.01M1.93M
Lot
80.09K19.31K
Turnover
5.6B423.72M
Average Price
699.78219.41
Value
5.6B423.72M
Indicative Equilibrium Price
705222
Indicative Equilibrium Volume
81.6K1.9K

Returns comparison

Trailing returns across standard periods

Top news

Latest headlines on both assets

HEAL
View details
KRAS
View details

About Medikaloka Hermina Tbk.

PT Medikaloka Hermina Tbk (“the Company”) was established based on Notarial Deed of Imam Santoso, S.H., No. 5 dated May 7, 1999.

Read more on HEAL

About Krakatau Steel (Persero) Tbk.

PT Krakatau Steel (Persero) was established on August 31, 1970 as a result of Indonesian Government Regulation No. 35 in the year 1970 regarding is equity establishment. The establishment of this steel industry was started by utilizing the left over machinery of the former Russian initiated Trikora Steel Project, mainly on cold wire drawing, bar mill, and section mill.These plants were officially opened by the President of Republic Indonesia in 1977.In 1979, the operation of the facilities such as direct reduction plant (with the capacity of 1.5 million tons per annum), billet steel plant (with the capacity of 500,000 tons per annum), wire rod mill (with the capacity of 220,000 tons per annum) and infrastructure such as a steam power plant (400MW), water purifying installation, port of Cigading and telecommunications system were officially opened.In 1983 relatively large scale plants also formally started their operation, they are slab steel plant and hot strip mill.This was followed in 1991 by a merger of a cold rolling mill plant in Cilegon industrial zone, to become the production unit of PT Krakatau Steel (Persero).

Read more on KRAS