Greenwood Sejahtera Tbk. vs Krakatau Steel (Persero) Tbk. — how do they compare? Greenwood Sejahtera Tbk. trades at Rp119 (market cap 920.49B, 1.58M 24h volume), while Krakatau Steel (Persero) Tbk. trades at Rp224 (market cap 4.41T, 10.07M 24h volume). The key difference: Krakatau Steel (Persero) Tbk. is far larger — about 4.8× Greenwood Sejahtera Tbk.'s market cap, and Krakatau Steel (Persero) Tbk. is more actively traded (10.07M versus 1.58M). Which is the better fit depends on your goals.
| GWSA | KRAS | |
|---|---|---|
Market Cap | 920.49B | 4.41T |
Volume | 1.58M | 10.07M |
Lot | 15.83K | 100.67K |
Turnover | 190.42M | 2.28B |
Average Price | 120.33 | 226.43 |
Value | 190.42M | 2.28B |
Indicative Equilibrium Price | 119 | 224 |
Indicative Equilibrium Volume | 936 | 3.88K |
Trailing returns across standard periods
Latest headlines on both assets
Greenwood Sejahtera is part of KG Global Development. On the begining, the company have a relation with Jababeka group, which own the land that has been used to builit TCC Batavia.PT Greenwood Sejahtera, company that developing The City Center Batavia (TCC Batavia), on December 23, 2011. The City Center Batavia is a superblock, mix used development project on top of 2,1 hectares of land. Its first tower is a skycrapper building: a tower with 46 storey, plus an 8 storey annex. According to the masterplan, Greenwood Sejahtera will build 3 tower on the site. The other tower will be completed in 2017 and the area will be expanded to 5.4 hectares. Its ground breaking ceremony is on September 12, 2009.
Read more on GWSA →PT Krakatau Steel (Persero) was established on August 31, 1970 as a result of Indonesian Government Regulation No. 35 in the year 1970 regarding is equity establishment. The establishment of this steel industry was started by utilizing the left over machinery of the former Russian initiated Trikora Steel Project, mainly on cold wire drawing, bar mill, and section mill.These plants were officially opened by the President of Republic Indonesia in 1977.In 1979, the operation of the facilities such as direct reduction plant (with the capacity of 1.5 million tons per annum), billet steel plant (with the capacity of 500,000 tons per annum), wire rod mill (with the capacity of 220,000 tons per annum) and infrastructure such as a steam power plant (400MW), water purifying installation, port of Cigading and telecommunications system were officially opened.In 1983 relatively large scale plants also formally started their operation, they are slab steel plant and hot strip mill.This was followed in 1991 by a merger of a cold rolling mill plant in Cilegon industrial zone, to become the production unit of PT Krakatau Steel (Persero).
Read more on KRAS →