Investment
Features
FeesSafety
Academy
More
Pluang+

Compare Aman Agrindo Tbk. (GULA) vs Krakatau Steel (Persero) Tbk. (KRAS) Price & Performance

Aman Agrindo Tbk.Trade
Krakatau Steel (Persero) Tbk.Trade

Price performance (Past 24H)

Key statistics

Aman Agrindo Tbk. vs Krakatau Steel (Persero) Tbk. — how do they compare? Aman Agrindo Tbk. trades at Rp650 (market cap 690.38B, 19.18M 24h volume), while Krakatau Steel (Persero) Tbk. trades at Rp224 (market cap 4.41T, 10.07M 24h volume). The key difference: Krakatau Steel (Persero) Tbk. is far larger — about 6.4× Aman Agrindo Tbk.'s market cap, and Aman Agrindo Tbk. is more actively traded (19.18M versus 10.07M). Which is the better fit depends on your goals.

GULAKRAS
Market Cap
690.38B4.41T
Volume
19.18M10.07M
Lot
191.81K100.67K
Turnover
12.3B2.28B
Average Price
641.33226.43
Value
12.3B2.28B
Indicative Equilibrium Price
650224
Indicative Equilibrium Volume
5.11K3.88K

Returns comparison

Trailing returns across standard periods

Top news

Latest headlines on both assets

GULA
View details
KRAS
View details

About Aman Agrindo Tbk.

PT Aman Agrindo Tbk (the "Company") was established based on a Notarial Deed No. 73 dated May 24, 2013, of Agustinus Andi Toryanto S.H., Sp.N., M.Kn., Notary in Semarang.

Read more on GULA

About Krakatau Steel (Persero) Tbk.

PT Krakatau Steel (Persero) was established on August 31, 1970 as a result of Indonesian Government Regulation No. 35 in the year 1970 regarding is equity establishment. The establishment of this steel industry was started by utilizing the left over machinery of the former Russian initiated Trikora Steel Project, mainly on cold wire drawing, bar mill, and section mill.These plants were officially opened by the President of Republic Indonesia in 1977.In 1979, the operation of the facilities such as direct reduction plant (with the capacity of 1.5 million tons per annum), billet steel plant (with the capacity of 500,000 tons per annum), wire rod mill (with the capacity of 220,000 tons per annum) and infrastructure such as a steam power plant (400MW), water purifying installation, port of Cigading and telecommunications system were officially opened.In 1983 relatively large scale plants also formally started their operation, they are slab steel plant and hot strip mill.This was followed in 1991 by a merger of a cold rolling mill plant in Cilegon industrial zone, to become the production unit of PT Krakatau Steel (Persero).

Read more on KRAS