Lotte Chemical Titan Tbk. vs Terregra Asia Energy Tbk. — how do they compare? Lotte Chemical Titan Tbk. trades at Rp545 (market cap 3.15T, 3.73M 24h volume), while Terregra Asia Energy Tbk. trades at Rp27 (market cap 74.25B). The key difference: Lotte Chemical Titan Tbk. is far larger — about 42.4× Terregra Asia Energy Tbk.'s market cap. Which is the better fit depends on your goals.
| FPNI | TGRA | |
|---|---|---|
Market Cap | 3.15T | 74.25B |
Volume | 3.73M | — |
Lot | 37.31K | — |
Turnover | 2.02B | — |
Average Price | 541.28 | — |
Value | 2.02B | — |
Indicative Equilibrium Price | 545 | — |
Indicative Equilibrium Volume | 643 | — |
Trailing returns across standard periods
Latest headlines on both assets
PT. Lotte Chemical Titan Tbk. (the Company) was established in the Republic of Indonesia under the name of P.T. Indofatra Plastik Industri based on Notarial Deed No. 19 of Rukmasanti Hardjasatya, S.H., dated December 9, 1987. Subsequently, its name was changed to P.T. Fatrapolindo Nusa Industri based on Notarial Deed No. 53 dated July 18, 1988 of the same notary. The Company conduct in Bi-axially Oriented Polypropylene/ BOPP Film industry. Start the commercial operation on 1990 by one line production. Now, the corporate have load capacity 20.000 ton/year.
Read more on FPNI →PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.
Read more on TGRA →