Fortune Mate Indonesia Tbk vs Terregra Asia Energy Tbk. — how do they compare? Fortune Mate Indonesia Tbk trades at Rp254 (market cap 1.63T, 5.8K 24h volume), while Terregra Asia Energy Tbk. trades at Rp27 (market cap 74.25B). The key difference: Fortune Mate Indonesia Tbk is far larger — about 22× Terregra Asia Energy Tbk.'s market cap. Which is the better fit depends on your goals.
| FMII | TGRA | |
|---|---|---|
Market Cap | 1.63T | 74.25B |
Volume | 5.8K | — |
Lot | 58 | — |
Turnover | 1.45M | — |
Average Price | 249.52 | — |
Value | 1.45M | — |
Indicative Equilibrium Price | 254 | — |
Indicative Equilibrium Volume | 1 | — |
Trailing returns across standard periods
Latest headlines on both assets
PT Fortune Mate Indonesia Tbk (the Entity) was established within the framework of the Foreign Capital Investment Law (PMA) No. 1 year 1967 based on Notarial Deed No. 44 dated June 24, 1989 by Rika You Soo Shin, S.H., notary in Surabaya. The Entity has started its commercial operations since 1989 comprises the manufacturing of footwear were located in Sidoarjo, East Java and stopped its operation since middle of March 2004. The Entity's office and real estate are located in Surabaya.
Read more on FMII →PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.
Read more on TGRA →