Investment
Features
FeesSafety
Academy
More
Pluang+

Compare Falmaco Nonwoven Industri Tbk. (FLMC) vs Terregra Asia Energy Tbk. (TGRA) Price & Performance

Falmaco Nonwoven Industri Tbk.Trade
Terregra Asia Energy Tbk.Trade

Price performance (Past 24H)

Key statistics

Falmaco Nonwoven Industri Tbk. vs Terregra Asia Energy Tbk. — how do they compare? Falmaco Nonwoven Industri Tbk. trades at Rp136 (market cap 99.22B, 9.93M 24h volume), while Terregra Asia Energy Tbk. trades at Rp27 (market cap 74.25B). The key difference: Falmaco Nonwoven Industri Tbk. is the larger of the two by market cap. Which is the better fit depends on your goals.

FLMCTGRA
Market Cap
99.22B74.25B
Volume
9.93M
Lot
99.29K
Turnover
1.32B
Average Price
133.34
Value
1.32B
Indicative Equilibrium Price
136
Indicative Equilibrium Volume
2.51K

Returns comparison

Trailing returns across standard periods

Top news

Latest headlines on both assets

FLMC
View details
TGRA
View details

About Falmaco Nonwoven Industri Tbk.

PT Falmaco Nonwoven Industri Tbk (the “Company”) was established on July 23, 1996 based on Notarial Deed No. 9 of Lina Rachmawati, S.H. The Company strated its commercial operations in 1996.

Read more on FLMC

About Terregra Asia Energy Tbk.

PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.

Read more on TGRA