Investment
Features
FeesSafety
Academy
More
Pluang+

Compare Alfa Energi Investama Tbk. (FIRE) vs Terregra Asia Energy Tbk. (TGRA) Price & Performance

Alfa Energi Investama Tbk.Trade
Terregra Asia Energy Tbk.Trade

Price performance (Past 24H)

Key statistics

Alfa Energi Investama Tbk. vs Terregra Asia Energy Tbk. — how do they compare? Alfa Energi Investama Tbk. trades at Rp122 (market cap 184.42B, 14.36M 24h volume), while Terregra Asia Energy Tbk. trades at Rp27 (market cap 74.25B). The key difference: Alfa Energi Investama Tbk. is far larger — about 2.5× Terregra Asia Energy Tbk.'s market cap. Which is the better fit depends on your goals.

FIRETGRA
Market Cap
184.42B74.25B
Volume
14.36M
Lot
143.61K
Turnover
1.76B
Average Price
122.27
Value
1.76B
Indicative Equilibrium Price
122
Indicative Equilibrium Volume
2.52K

Returns comparison

Trailing returns across standard periods

Top news

Latest headlines on both assets

FIRE
View details
TGRA
View details

About Alfa Energi Investama Tbk.

PT Alfa Energi Investama Tbk (the Company) was established based on Notarial Deed No. 119 dated February 16, 2015 of Hasbullah Abdul Rasyid, S.H., M.Kn.

Read more on FIRE

About Terregra Asia Energy Tbk.

PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.

Read more on TGRA