Investment
Features
FeesSafety
Academy
More
Pluang+

Compare Eratex Djaja Tbk. (ERTX) vs Krakatau Steel (Persero) Tbk. (KRAS) Price & Performance

Eratex Djaja Tbk.Trade
Krakatau Steel (Persero) Tbk.Trade

Price performance (Past 24H)

Key statistics

Eratex Djaja Tbk. vs Krakatau Steel (Persero) Tbk. — how do they compare? Eratex Djaja Tbk. trades at Rp151 (market cap 189.12B, 2.73M 24h volume), while Krakatau Steel (Persero) Tbk. trades at Rp228 (market cap 4.33T, 2.2M 24h volume). The key difference: Krakatau Steel (Persero) Tbk. is far larger — about 22.9× Eratex Djaja Tbk.'s market cap, and Eratex Djaja Tbk. is more actively traded (2.73M versus 2.2M). Which is the better fit depends on your goals.

ERTXKRAS
Market Cap
189.12B4.33T
Volume
2.73M2.2M
Lot
27.34K21.96K
Turnover
402.83M491.58M
Average Price
147.34223.89
Value
402.83M491.58M
Indicative Equilibrium Price
148224
Indicative Equilibrium Volume
1515.8K

Returns comparison

Trailing returns across standard periods

Top news

Latest headlines on both assets

ERTX
View details
KRAS
View details

About Eratex Djaja Tbk.

PT Eratex Djaja Tbk (the "Entity") was established in the framework of Foreign Capital Investment Law No.1, 1967 by Notarial Deed No.7 dated October 12, 1972 based on Deed prepared by Koerniatini Karim, Public Notary in Jakarta. Founded in 1972 as a joint venture company between PT Private Development Finance Company of Indonesia Ltd. and Limmen Investment Ltd., Unisouh Holding Ltd., Eastern Cotton Mills Ltd. Yarn spinning factory was built in 1973 on 17 ha of land in Probolinggo.

Read more on ERTX

About Krakatau Steel (Persero) Tbk.

PT Krakatau Steel (Persero) was established on August 31, 1970 as a result of Indonesian Government Regulation No. 35 in the year 1970 regarding is equity establishment. The establishment of this steel industry was started by utilizing the left over machinery of the former Russian initiated Trikora Steel Project, mainly on cold wire drawing, bar mill, and section mill.These plants were officially opened by the President of Republic Indonesia in 1977.In 1979, the operation of the facilities such as direct reduction plant (with the capacity of 1.5 million tons per annum), billet steel plant (with the capacity of 500,000 tons per annum), wire rod mill (with the capacity of 220,000 tons per annum) and infrastructure such as a steam power plant (400MW), water purifying installation, port of Cigading and telecommunications system were officially opened.In 1983 relatively large scale plants also formally started their operation, they are slab steel plant and hot strip mill.This was followed in 1991 by a merger of a cold rolling mill plant in Cilegon industrial zone, to become the production unit of PT Krakatau Steel (Persero).

Read more on KRAS