Sinar Eka Selaras Tbk. vs Terregra Asia Energy Tbk. — how do they compare? Sinar Eka Selaras Tbk. trades at Rp320 (market cap 1.67T, 6.96M 24h volume), while Terregra Asia Energy Tbk. trades at Rp27 (market cap 74.25B). The key difference: Sinar Eka Selaras Tbk. is far larger — about 22.5× Terregra Asia Energy Tbk.'s market cap. Which is the better fit depends on your goals.
| ERAL | TGRA | |
|---|---|---|
Market Cap | 1.67T | 74.25B |
Volume | 6.96M | — |
Lot | 69.56K | — |
Turnover | 2.22B | — |
Average Price | 319.06 | — |
Value | 2.22B | — |
Indicative Equilibrium Price | 320 | — |
Indicative Equilibrium Volume | 1.31K | — |
Trailing returns across standard periods
Latest headlines on both assets
PT Sinar Eka Selaras Tbk (the “Company”) was established in Indonesia based on Notarial Deed No. 12 of Myra Yuwono, S.H., dated March 13, 2009. PT Erajaya Swasembada Tbk, an entity incorporated in Indonesia, is the parent company of the Company. PT Eralink International, an entity incorporated inIndonesia, is the ultimate parent of the Company.
Read more on ERAL →PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.
Read more on TGRA →