Erajaya Swasembada Tbk. vs Krakatau Steel (Persero) Tbk. — how do they compare? Erajaya Swasembada Tbk. trades at Rp362 (market cap 5.74T, 26.16M 24h volume), while Krakatau Steel (Persero) Tbk. trades at Rp224 (market cap 4.41T, 10.07M 24h volume). The key difference: Erajaya Swasembada Tbk. is the larger of the two by market cap, and Erajaya Swasembada Tbk. is more actively traded (26.16M versus 10.07M). Which is the better fit depends on your goals.
| ERAA | KRAS | |
|---|---|---|
Market Cap | 5.74T | 4.41T |
Volume | 26.16M | 10.07M |
Lot | 261.63K | 100.67K |
Turnover | 9.41B | 2.28B |
Average Price | 359.75 | 226.43 |
Value | 9.41B | 2.28B |
Indicative Equilibrium Price | 362 | 224 |
Indicative Equilibrium Volume | 1.96K | 3.88K |
Trailing returns across standard periods
Latest headlines on both assets
PT Erajaya Swasembada Tbk (the Company) was established in Jakarta based on Notarial Deed No.7 of Myra Yuwono, S.H., dated October 8, 1996. Erajaya Group is the official distributor for 10 international mobile communication brands and an authorised partner for major mobile operators. Recently, the Group has launched its own mobile handset under the name of Venera. In 1996, PT Erajaya Swasembada, or Erajaya, the establishment of what we know today as the Erajaya Group, was incorporated.
Read more on ERAA →PT Krakatau Steel (Persero) was established on August 31, 1970 as a result of Indonesian Government Regulation No. 35 in the year 1970 regarding is equity establishment. The establishment of this steel industry was started by utilizing the left over machinery of the former Russian initiated Trikora Steel Project, mainly on cold wire drawing, bar mill, and section mill.These plants were officially opened by the President of Republic Indonesia in 1977.In 1979, the operation of the facilities such as direct reduction plant (with the capacity of 1.5 million tons per annum), billet steel plant (with the capacity of 500,000 tons per annum), wire rod mill (with the capacity of 220,000 tons per annum) and infrastructure such as a steam power plant (400MW), water purifying installation, port of Cigading and telecommunications system were officially opened.In 1983 relatively large scale plants also formally started their operation, they are slab steel plant and hot strip mill.This was followed in 1991 by a merger of a cold rolling mill plant in Cilegon industrial zone, to become the production unit of PT Krakatau Steel (Persero).
Read more on KRAS →