Energi Mega Persada Tbk. vs Krakatau Steel (Persero) Tbk. — how do they compare? Energi Mega Persada Tbk. trades at Rp1,395 (market cap 36.92T, 42.33M 24h volume), while Krakatau Steel (Persero) Tbk. trades at Rp226 (market cap 4.33T, 1.93M 24h volume). The key difference: Energi Mega Persada Tbk. is far larger — about 8.5× Krakatau Steel (Persero) Tbk.'s market cap, and Energi Mega Persada Tbk. is more actively traded (42.33M versus 1.93M). Which is the better fit depends on your goals.
| ENRG | KRAS | |
|---|---|---|
Market Cap | 36.92T | 4.33T |
Volume | 42.33M | 1.93M |
Lot | 423.29K | 19.3K |
Turnover | 58.8B | 431.16M |
Average Price | 1,389.01 | 223.4 |
Value | 58.8B | 431.16M |
Indicative Equilibrium Price | 1,385 | 224 |
Indicative Equilibrium Volume | 3.88K | 15.8K |
Trailing returns across standard periods
Latest headlines on both assets
PT Energi Mega Persada (Company) was established base on notarial deed No. 16 of H. Rakhmat Syamsul Rizal SH, dated Oct 16, 2001. The deed of establishment was approved by the Ministry of Justice in its decision letter No. C2-14507.HT.01.01.Th.2001 dated Nov 29, 2001. The Company’s articles of association has been amended several times, most recently by notarial deed No. 40 of Lena Magdalena S.H., dated Mar 30, 2004, concerning among others, the change in the Company’s name, increasing in capital paid up and public offering of stock.
Read more on ENRG →PT Krakatau Steel (Persero) was established on August 31, 1970 as a result of Indonesian Government Regulation No. 35 in the year 1970 regarding is equity establishment. The establishment of this steel industry was started by utilizing the left over machinery of the former Russian initiated Trikora Steel Project, mainly on cold wire drawing, bar mill, and section mill.These plants were officially opened by the President of Republic Indonesia in 1977.In 1979, the operation of the facilities such as direct reduction plant (with the capacity of 1.5 million tons per annum), billet steel plant (with the capacity of 500,000 tons per annum), wire rod mill (with the capacity of 220,000 tons per annum) and infrastructure such as a steam power plant (400MW), water purifying installation, port of Cigading and telecommunications system were officially opened.In 1983 relatively large scale plants also formally started their operation, they are slab steel plant and hot strip mill.This was followed in 1991 by a merger of a cold rolling mill plant in Cilegon industrial zone, to become the production unit of PT Krakatau Steel (Persero).
Read more on KRAS →