Bakrieland Development Tbk. vs Terregra Asia Energy Tbk. — how do they compare? Bakrieland Development Tbk. trades at Rp35 (market cap 1.52T, 58.45M 24h volume), while Terregra Asia Energy Tbk. trades at Rp27 (market cap 74.25B). The key difference: Bakrieland Development Tbk. is far larger — about 20.5× Terregra Asia Energy Tbk.'s market cap. Which is the better fit depends on your goals.
| ELTY | TGRA | |
|---|---|---|
Market Cap | 1.52T | 74.25B |
Volume | 58.45M | — |
Lot | 584.46K | — |
Turnover | 2.03B | — |
Average Price | 34.68 | — |
Value | 2.03B | — |
Indicative Equilibrium Price | 35 | — |
Indicative Equilibrium Volume | 99.73K | — |
Trailing returns across standard periods
Latest headlines on both assets
PT Bakrieland Development Tbk. (“The Company”) was established with Notarial Deed No. 209 of John Leonard Waworuntu, S.H., dated June 12, 1990. The Company's articles of association have been amended several times, among others, the changes of the Company's name from PT Elang Realty (formerly PT. Purilestari Indah Pratama) Tbk. to PT Bakrieland Development Tbk. which have been notarized by Notarial Deed No. 29 of Harun Kamil, S.H., dated April 3, 1997.
Read more on ELTY →PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.
Read more on TGRA →