Elnusa Tbk. vs Krakatau Steel (Persero) Tbk. — how do they compare? Elnusa Tbk. trades at Rp650 (market cap 4.82T, 17.35M 24h volume), while Krakatau Steel (Persero) Tbk. trades at Rp224 (market cap 4.41T, 10.07M 24h volume). The key difference: Elnusa Tbk. and Krakatau Steel (Persero) Tbk. are close in size by market cap, and Elnusa Tbk. is more actively traded (17.35M versus 10.07M). Which is the better fit depends on your goals.
| ELSA | KRAS | |
|---|---|---|
Market Cap | 4.82T | 4.41T |
Volume | 17.35M | 10.07M |
Lot | 173.5K | 100.67K |
Turnover | 11.24B | 2.28B |
Average Price | 648.03 | 226.43 |
Value | 11.24B | 2.28B |
Indicative Equilibrium Price | 650 | 224 |
Indicative Equilibrium Volume | 7.68K | 3.88K |
Trailing returns across standard periods
Latest headlines on both assets
PT Elnusa Tbk (Company) was established under the name of PT Elektronika Nusantara on January 25, 1969 based on notarial deed No.18 of Tan Thong Kie, S.H., dated January 25, 1969, as amended by notarial deed No. 10 of the same notary dated February 13, 1969. The Company’s articles of association has been amended several times, most recently by notarial deed No. 2 of Soegeng Santosa, S.H., dated Jan 7, 2002, concerning among others, the change in the Company’s name and public offering.
Read more on ELSA →PT Krakatau Steel (Persero) was established on August 31, 1970 as a result of Indonesian Government Regulation No. 35 in the year 1970 regarding is equity establishment. The establishment of this steel industry was started by utilizing the left over machinery of the former Russian initiated Trikora Steel Project, mainly on cold wire drawing, bar mill, and section mill.These plants were officially opened by the President of Republic Indonesia in 1977.In 1979, the operation of the facilities such as direct reduction plant (with the capacity of 1.5 million tons per annum), billet steel plant (with the capacity of 500,000 tons per annum), wire rod mill (with the capacity of 220,000 tons per annum) and infrastructure such as a steam power plant (400MW), water purifying installation, port of Cigading and telecommunications system were officially opened.In 1983 relatively large scale plants also formally started their operation, they are slab steel plant and hot strip mill.This was followed in 1991 by a merger of a cold rolling mill plant in Cilegon industrial zone, to become the production unit of PT Krakatau Steel (Persero).
Read more on KRAS →