Investment
Features
FeesSafety
Academy
More
Pluang+

Compare Pelayaran Nasional Ekalya Purnamasari Tbk. (ELPI) vs Terregra Asia Energy Tbk. (TGRA) Price & Performance

Pelayaran Nasional Ekalya Purnamasari Tbk.Trade
Terregra Asia Energy Tbk.Trade

Price performance (Past 24H)

Key statistics

Pelayaran Nasional Ekalya Purnamasari Tbk. vs Terregra Asia Energy Tbk. — how do they compare? Pelayaran Nasional Ekalya Purnamasari Tbk. trades at Rp680 (market cap 6.76T, 2.66M 24h volume), while Terregra Asia Energy Tbk. trades at Rp27 (market cap 74.25B). The key difference: Pelayaran Nasional Ekalya Purnamasari Tbk. is far larger — about 91× Terregra Asia Energy Tbk.'s market cap. Which is the better fit depends on your goals.

ELPITGRA
Market Cap
6.76T74.25B
Volume
2.66M
Lot
26.59K
Turnover
1.79B
Average Price
672.01
Value
1.79B
Indicative Equilibrium Price
680
Indicative Equilibrium Volume
580

Returns comparison

Trailing returns across standard periods

Top news

Latest headlines on both assets

ELPI
View details
TGRA
View details

About Pelayaran Nasional Ekalya Purnamasari Tbk.

PT Pelayaran Nasional Ekalya Purnamasari Tbk (the Entity) was established based on Notarial Deed No. 11 of Grace Margareth Goenawan, S.H., dated April 20, 1992 in Ambon. PT Pelayaran Nasional Ekalya Purnamasari is the parent Entity, whereas PT Kreasi Cipta Timur is the ultimate parent of the Entity. The Entity’s Ultimate Beneficiary Ownership (UBO) is Eka Taniputra.

Read more on ELPI

About Terregra Asia Energy Tbk.

PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.

Read more on TGRA