Saranacentral Bajatama Tbk vs Cikarang Listrindo Tbk. — how do they compare? Saranacentral Bajatama Tbk trades at Rp161 (market cap 288B, 1.21M 24h volume), while Cikarang Listrindo Tbk. trades at Rp715 (market cap 11.5T, 3.3M 24h volume). The key difference: Cikarang Listrindo Tbk. is far larger — about 39.9× Saranacentral Bajatama Tbk's market cap, and Cikarang Listrindo Tbk. is more actively traded (3.3M versus 1.21M). Which is the better fit depends on your goals.
| BAJA | POWR | |
|---|---|---|
Market Cap | 288B | 11.5T |
Volume | 1.21M | 3.3M |
Lot | 12.09K | 32.96K |
Turnover | 193.62M | 2.35B |
Average Price | 160.18 | 713.6 |
Value | 193.62M | 2.35B |
Indicative Equilibrium Price | 161 | 715 |
Indicative Equilibrium Volume | 4 | 588 |
Trailing returns across standard periods
Latest headlines on both assets
PT. Saranacentral Bajatama (SCB), established in 1996, is belonging to Sarana Steel Group, which was set up in 1970 and has built up its strong reputation in the worldwide steel industry. In order to provide competitive Hot-Dip Galvanized Steel Sheet/Coil to the customers, SCB take advantage of more advanced NOF (Non-Oxidation Furnace) System for production process, by which SCB differentiate itself from other competitors that use conventional processing system.
Read more on BAJA →PT Cikarang Listrindo Tbk (the Company) was established within the framework of the Domestic Investment Law No. 6 Year 1968 which was amended by Law No. 12 Year 1970, based on Notarial Deed No. 187 of Lukman Kirana, S.H., dated July 28, 1990. About 45 km southeast of Jakarta, starting in 1992, Cikarang Listrindo built its first power plant in the heart of Jababeka Industrial Estate and since then has set the pace for industrial development by providing its customers with a high quality supply of electricity. More than 2,000 customers in 5 industrial estates trust Cikarang Listrindo to deliver reliable and stable power. Among those customers are national and international manufacturers in such sectors as automobiles, electronics, plastics, food and chemicals. They include multinational firms such as PT Astra Honda Motor, PT Mattel Indonesia, PT Omron Manufacturing of Indonesia, PT Komatsu Undercarriage Indonesia, PT Mayora Indah, PT Aisin Indonesia, PT Yanmar Indonesia, PT AJE Indonesia, PT Mitsubishi Electric Automotive, PT Enkei Indonesia, PT Jotun Indonesia, PT Kao Indonesia, PT Kansai Paint Indonesia, PT Kayaba Indonesia and PT Showa Indonesia Manufacturing along with many leading national companies. To meet the industrial customers’ growing demand and to have a more reliable electricity supply system, in 2015 Cikarang Listrindo operates its additional power plant in Megalopolis Manunggal 2100 Industrial Town. Cikarang Listrindo has now a combined plant capacity of 864 MW. An expansion program to raise available power up to 1,144 MW is in progress. Besides satisfying the demand of its industrial customers the company exports power to the national electricity grid of PLN. The company is committed to providing all its customers with the highest level of service in meeting their needs for stable and reliable power. Seamless and smooth supply of electricity gives customers a significant advantage in their operations and affords a level of reliability unsurpassed in Indonesia’s energy market.
Read more on POWR →