
Trekor Metals announced its Q2 2026 copper production results, with 30.3 million pounds from the Gibraltar mine and 5.2 million pounds from the Florence Copper facility, totaling 36 million pounds. Production at Gibraltar remained steady with consistent ore grades and mill throughput, while Florence Copper's ramp-up progressed smoothly, integrating new wells to boost output. The company maintained its 2026 annual production guidance for both sites and highlighted ongoing efforts to optimize wellfield operations and expand production capacity at Florence Copper. Operating costs at Gibraltar were affected by higher diesel and explosive prices, but overall production performance met expectations.