
Myriad Uranium Corp. announced preliminary gamma probe uranium results from its Phase II drilling program at Lucky Cliff, part of the Copper Mountain project. Four drill holes totaling 716.6 meters intersected multiple broad intervals of near-surface uranium mineralization, with 50 intervals exceeding 100 ppm equivalent uranium. The longest interval was nearly 20 meters at 269 ppm, and the highest grade reached 1,336 ppm. These results are preliminary and await laboratory assay confirmation but suggest new uranium resources outside historical estimates, potentially expanding the project's uranium endowment. Further drilling and assays will verify these findings and support future resource estimates.