Investment
Features
FeesSafety
Academy
More
Pluang+

Compare Delta Giri Wacana Tbk. (DGWG) vs Krakatau Steel (Persero) Tbk. (KRAS) Price & Performance

Delta Giri Wacana Tbk.Trade
Krakatau Steel (Persero) Tbk.Trade

Price performance (Past 24H)

Key statistics

Delta Giri Wacana Tbk. vs Krakatau Steel (Persero) Tbk. — how do they compare? Delta Giri Wacana Tbk. trades at Rp282 (market cap 1.64T, 9.12M 24h volume), while Krakatau Steel (Persero) Tbk. trades at Rp228 (market cap 4.33T, 2.2M 24h volume). The key difference: Krakatau Steel (Persero) Tbk. is far larger — about 2.6× Delta Giri Wacana Tbk.'s market cap, and Delta Giri Wacana Tbk. is more actively traded (9.12M versus 2.2M). Which is the better fit depends on your goals.

DGWGKRAS
Market Cap
1.64T4.33T
Volume
9.12M2.2M
Lot
91.22K21.96K
Turnover
2.55B491.58M
Average Price
279.72223.89
Value
2.55B491.58M
Indicative Equilibrium Price
278224
Indicative Equilibrium Volume
1.8K15.8K

Returns comparison

Trailing returns across standard periods

Top news

Latest headlines on both assets

DGWG
View details
KRAS
View details

About Delta Giri Wacana Tbk.

PT Delta Giri Wacana Tbk (the “Company”) was established on 29 November 2011 based on Notarial Deed No. 52 of Innovani Damanik, S.H., notary in Jakarta. The Company started its commercial operations in June 2013.

Read more on DGWG

About Krakatau Steel (Persero) Tbk.

PT Krakatau Steel (Persero) was established on August 31, 1970 as a result of Indonesian Government Regulation No. 35 in the year 1970 regarding is equity establishment. The establishment of this steel industry was started by utilizing the left over machinery of the former Russian initiated Trikora Steel Project, mainly on cold wire drawing, bar mill, and section mill.These plants were officially opened by the President of Republic Indonesia in 1977.In 1979, the operation of the facilities such as direct reduction plant (with the capacity of 1.5 million tons per annum), billet steel plant (with the capacity of 500,000 tons per annum), wire rod mill (with the capacity of 220,000 tons per annum) and infrastructure such as a steam power plant (400MW), water purifying installation, port of Cigading and telecommunications system were officially opened.In 1983 relatively large scale plants also formally started their operation, they are slab steel plant and hot strip mill.This was followed in 1991 by a merger of a cold rolling mill plant in Cilegon industrial zone, to become the production unit of PT Krakatau Steel (Persero).

Read more on KRAS