Investment
Features
FeesSafety
Academy
More
Pluang+

Compare Barito Renewables Energy Tbk (BREN) vs Krakatau Steel (Persero) Tbk. (KRAS) Price & Performance

Barito Renewables Energy TbkTrade
Krakatau Steel (Persero) Tbk.Trade

Price performance (Past 24H)

Key statistics

Barito Renewables Energy Tbk vs Krakatau Steel (Persero) Tbk. — how do they compare? Barito Renewables Energy Tbk trades at Rp3,430 (market cap 452.2T, 21.97M 24h volume), while Krakatau Steel (Persero) Tbk. trades at Rp224 (market cap 4.41T, 10.07M 24h volume). The key difference: Barito Renewables Energy Tbk is far larger — about 102.5× Krakatau Steel (Persero) Tbk.'s market cap, and Barito Renewables Energy Tbk is more actively traded (21.97M versus 10.07M). Which is the better fit depends on your goals.

BRENKRAS
Market Cap
452.2T4.41T
Volume
21.97M10.07M
Lot
219.66K100.67K
Turnover
75.87B2.28B
Average Price
3,454.14226.43
Value
75.87B2.28B
Indicative Equilibrium Price
3,430224
Indicative Equilibrium Volume
8.6K3.88K

Returns comparison

Trailing returns across standard periods

Top news

Latest headlines on both assets

BREN
View details
KRAS
View details

About Barito Renewables Energy Tbk

PT Barito Renewables Energy Tbk (formerly PT Barito Cahaya Nusantara) (the “Company”) was established based on the Notarial Deed of Nanny Wiana Setiawan, S.H., Notary in Jakarta, No. 3 dated5 February 2018. The direct parent and ultimate parent entity of the Company is PT Barito Pacific Tbk. (Barito).

Read more on BREN

About Krakatau Steel (Persero) Tbk.

PT Krakatau Steel (Persero) was established on August 31, 1970 as a result of Indonesian Government Regulation No. 35 in the year 1970 regarding is equity establishment. The establishment of this steel industry was started by utilizing the left over machinery of the former Russian initiated Trikora Steel Project, mainly on cold wire drawing, bar mill, and section mill.These plants were officially opened by the President of Republic Indonesia in 1977.In 1979, the operation of the facilities such as direct reduction plant (with the capacity of 1.5 million tons per annum), billet steel plant (with the capacity of 500,000 tons per annum), wire rod mill (with the capacity of 220,000 tons per annum) and infrastructure such as a steam power plant (400MW), water purifying installation, port of Cigading and telecommunications system were officially opened.In 1983 relatively large scale plants also formally started their operation, they are slab steel plant and hot strip mill.This was followed in 1991 by a merger of a cold rolling mill plant in Cilegon industrial zone, to become the production unit of PT Krakatau Steel (Persero).

Read more on KRAS