Investment
Features
FeesSafety
Academy
More
Pluang+

Compare Agung Menjangan Mas Tbk. (AMMS) vs Krakatau Steel (Persero) Tbk. (KRAS) Price & Performance

Agung Menjangan Mas Tbk.Trade
Krakatau Steel (Persero) Tbk.Trade

Price performance (Past 24H)

Key statistics

Agung Menjangan Mas Tbk. vs Krakatau Steel (Persero) Tbk. — how do they compare? Agung Menjangan Mas Tbk. trades at Rp171 (market cap 221.12B, 791.2K 24h volume), while Krakatau Steel (Persero) Tbk. trades at Rp222 (market cap 4.33T, 2.34M 24h volume). The key difference: Krakatau Steel (Persero) Tbk. is far larger — about 19.6× Agung Menjangan Mas Tbk.'s market cap, and Krakatau Steel (Persero) Tbk. is more actively traded (2.34M versus 791.2K). Which is the better fit depends on your goals.

AMMSKRAS
Market Cap
221.12B4.33T
Volume
791.2K2.34M
Lot
7.91K23.37K
Turnover
139.56M515.39M
Average Price
176.39220.52
Value
139.56M515.39M
Indicative Equilibrium Price
171222
Indicative Equilibrium Volume
458398

Returns comparison

Trailing returns across standard periods

Top news

Latest headlines on both assets

AMMS
View details
KRAS
View details

About Agung Menjangan Mas Tbk.

PT Agung Menjangan Mas Tbk (the Company) formerly known as PT Cosmopolitan Electric was established by Deed No. 31 dated August 9, 2007 by Linda Herawati, S.H., a public notary in Jakarta. Berdasarkan akta No. 1 tanggal 3 Februari 2020 oleh Yudha Setyagraha Tedianto, S.H., M.M., M.Kn, notaris di Bekasi, PT Cosmopolitan Electric telah berubah nama menjadi PT Agung Menjangan Mas The Company started commercial operrations in 2017.

Read more on AMMS

About Krakatau Steel (Persero) Tbk.

PT Krakatau Steel (Persero) was established on August 31, 1970 as a result of Indonesian Government Regulation No. 35 in the year 1970 regarding is equity establishment. The establishment of this steel industry was started by utilizing the left over machinery of the former Russian initiated Trikora Steel Project, mainly on cold wire drawing, bar mill, and section mill.These plants were officially opened by the President of Republic Indonesia in 1977.In 1979, the operation of the facilities such as direct reduction plant (with the capacity of 1.5 million tons per annum), billet steel plant (with the capacity of 500,000 tons per annum), wire rod mill (with the capacity of 220,000 tons per annum) and infrastructure such as a steam power plant (400MW), water purifying installation, port of Cigading and telecommunications system were officially opened.In 1983 relatively large scale plants also formally started their operation, they are slab steel plant and hot strip mill.This was followed in 1991 by a merger of a cold rolling mill plant in Cilegon industrial zone, to become the production unit of PT Krakatau Steel (Persero).

Read more on KRAS